A 5-parameter complexity classification of the two-stage flow shop scheduling problem with job dependent storage requirements (Q2230732): Difference between revisions

From MaRDI portal
Importer (talk | contribs)
Created a new Item
 
Set OpenAlex properties.
 
(2 intermediate revisions by 2 users not shown)
Property / MaRDI profile type
 
Property / MaRDI profile type: MaRDI publication profile / rank
 
Normal rank
Property / full work available at URL
 
Property / full work available at URL: https://doi.org/10.1007/s10878-021-00706-4 / rank
 
Normal rank
Property / OpenAlex ID
 
Property / OpenAlex ID: W3127761927 / rank
 
Normal rank
links / mardi / namelinks / mardi / name
 

Latest revision as of 23:05, 19 March 2024

scientific article
Language Label Description Also known as
English
A 5-parameter complexity classification of the two-stage flow shop scheduling problem with job dependent storage requirements
scientific article

    Statements

    A 5-parameter complexity classification of the two-stage flow shop scheduling problem with job dependent storage requirements (English)
    0 references
    0 references
    0 references
    0 references
    28 September 2021
    0 references
    0 references
    computational complexity
    0 references
    flow shop
    0 references
    buffer
    0 references
    polynomial-time algorithms
    0 references
    resource constrained scheduling
    0 references
    0 references