Coordinated scheduling of production and delivery with production window and delivery capacity constraints (Q417989): Difference between revisions

From MaRDI portal
Import240304020342 (talk | contribs)
Set profile property.
Normalize DOI.
 
(2 intermediate revisions by 2 users not shown)
Property / DOI
 
Property / DOI: 10.1016/j.tcs.2011.11.035 / rank
Normal rank
 
Property / full work available at URL
 
Property / full work available at URL: https://doi.org/10.1016/j.tcs.2011.11.035 / rank
 
Normal rank
Property / OpenAlex ID
 
Property / OpenAlex ID: W1987108258 / rank
 
Normal rank
Property / cites work
 
Property / cites work: A zero-inventory production and distribution problem with a fixed customer sequence / rank
 
Normal rank
Property / cites work
 
Property / cites work: Approximating the Throughput of Multiple Machines in Real-Time Scheduling / rank
 
Normal rank
Property / cites work
 
Property / cites work: A Polynomial Time Approximation Scheme for the Multiple Knapsack Problem / rank
 
Normal rank
Property / cites work
 
Property / cites work: Q3374091 / rank
 
Normal rank
Property / cites work
 
Property / cites work: Integrated Production and Outbound Distribution Scheduling: Review and Extensions / rank
 
Normal rank
Property / cites work
 
Property / cites work: Integrated production/distribution planning in supply chains: An invited review / rank
 
Normal rank
Property / cites work
 
Property / cites work: Two-Processor Scheduling with Start-Times and Deadlines / rank
 
Normal rank
Property / cites work
 
Property / cites work: Q4198056 / rank
 
Normal rank
Property / cites work
 
Property / cites work: Modeling and design of global logistics systems: a review of integrated strategic and tactical models and design algorithms / rank
 
Normal rank
Property / cites work
 
Property / cites work: Integrated production and delivery scheduling with disjoint windows / rank
 
Normal rank
Property / cites work
 
Property / cites work: Q4633878 / rank
 
Normal rank
Property / cites work
 
Property / cites work: Q4941826 / rank
 
Normal rank
Property / cites work
 
Property / cites work: Multiple subset sum with inclusive assignment set restrictions / rank
 
Normal rank
Property / cites work
 
Property / cites work: Exact and approximation algorithms for the operational fixed interval scheduling problem / rank
 
Normal rank
Property / DOI
 
Property / DOI: 10.1016/J.TCS.2011.11.035 / rank
 
Normal rank

Latest revision as of 16:56, 9 December 2024

scientific article
Language Label Description Also known as
English
Coordinated scheduling of production and delivery with production window and delivery capacity constraints
scientific article

    Statements

    Coordinated scheduling of production and delivery with production window and delivery capacity constraints (English)
    0 references
    0 references
    0 references
    0 references
    14 May 2012
    0 references
    coordinated scheduling
    0 references
    production
    0 references
    delivery
    0 references
    PTAS
    0 references

    Identifiers