Integrated production planning and preventive maintenance in deteriorating production systems (Q5892261): Difference between revisions

From MaRDI portal
Import240304020342 (talk | contribs)
Set profile property.
Normalize DOI.
 
(3 intermediate revisions by 3 users not shown)
Property / DOI
 
Property / DOI: 10.1016/j.ins.2014.03.097 / rank
Normal rank
 
Property / full work available at URL
 
Property / full work available at URL: https://doi.org/10.1016/j.ins.2014.03.097 / rank
 
Normal rank
Property / OpenAlex ID
 
Property / OpenAlex ID: W2077548276 / rank
 
Normal rank
Property / cites work
 
Property / cites work: The multi-item capacitated lot-sizing problem with setup times and shortage costs / rank
 
Normal rank
Property / cites work
 
Property / cites work: An integrated production and preventive maintenance planning model / rank
 
Normal rank
Property / cites work
 
Property / cites work: Integrated production planning and preventive maintenance in deteriorating production systems / rank
 
Normal rank
Property / cites work
 
Property / cites work: Hedging point policy improvement / rank
 
Normal rank
Property / cites work
 
Property / cites work: Q4934199 / rank
 
Normal rank
Property / cites work
 
Property / cites work: Q3525910 / rank
 
Normal rank
Property / cites work
 
Property / cites work: A fuzzy control system with application to production planning problems / rank
 
Normal rank
Property / cites work
 
Property / cites work: Optimal maintenance models for systems subject to failure–A Review / rank
 
Normal rank
Property / DOI
 
Property / DOI: 10.1016/J.INS.2014.03.097 / rank
 
Normal rank

Latest revision as of 19:46, 9 December 2024

scientific article; zbMATH DE number 6679945
Language Label Description Also known as
English
Integrated production planning and preventive maintenance in deteriorating production systems
scientific article; zbMATH DE number 6679945

    Statements

    Integrated production planning and preventive maintenance in deteriorating production systems (English)
    0 references
    0 references
    0 references
    0 references
    2 February 2017
    0 references
    production planning
    0 references
    preventive maintenance
    0 references
    lot sizing
    0 references
    failure-prone
    0 references

    Identifiers