A two-level hedging point policy for controlling a manufacturing system with time-delay, demand uncertainty and extra capacity (Q853029): Difference between revisions

From MaRDI portal
Import240304020342 (talk | contribs)
Set profile property.
ReferenceBot (talk | contribs)
Changed an Item
 
(One intermediate revision by one other user not shown)
Property / full work available at URL
 
Property / full work available at URL: https://doi.org/10.1016/j.ejor.2005.10.032 / rank
 
Normal rank
Property / OpenAlex ID
 
Property / OpenAlex ID: W2085351866 / rank
 
Normal rank
Property / cites work
 
Property / cites work: Optimal control of production rate in a failure prone manufacturing system / rank
 
Normal rank
Property / cites work
 
Property / cites work: Optimality of Zero-Inventory Policies for Unreliable Manufacturing Systems / rank
 
Normal rank
Property / cites work
 
Property / cites work: A heuristic methodology for order distribution in a demand driven collaborative supply chain / rank
 
Normal rank
Property / cites work
 
Property / cites work: Optimal threshold control in discrete failure-prone manufacturing systems / rank
 
Normal rank
Property / cites work
 
Property / cites work: Scheduling manufacturing systems with work-in-process inventory control: multiple-part-type systems / rank
 
Normal rank
Property / cites work
 
Property / cites work: General receding horizon control for linear time-delay systems / rank
 
Normal rank
Property / cites work
 
Property / cites work: Balancing facilities in aggregate production planning: Make-to-order and make-to-stock environments / rank
 
Normal rank
Property / cites work
 
Property / cites work: Scheduling multiple part-types in an unreliable single-machine manufacturing system / rank
 
Normal rank
Property / cites work
 
Property / cites work: Hedging policies for failure-prone manufacturing systems: optimality of JIT and bounds on buffer levels / rank
 
Normal rank
Property / cites work
 
Property / cites work: Failure-prone production systems with uncertain demand / rank
 
Normal rank
Property / cites work
 
Property / cites work: Partial Characterization of Optimal Hedging Point Policies in Unreliable Two-Part-Type Manufacturing Systems / rank
 
Normal rank
Property / cites work
 
Property / cites work: Production control of a pull system with production and demand uncertainty / rank
 
Normal rank
Property / cites work
 
Property / cites work: COMPLEX NETWORKS: TOPOLOGY, DYNAMICS AND SYNCHRONIZATION / rank
 
Normal rank
Property / cites work
 
Property / cites work: Synchronization in scale-free dynamical networks: robustness and fragility / rank
 
Normal rank
Property / cites work
 
Property / cites work: Pinning control of scale-free dynamical networks / rank
 
Normal rank
Property / cites work
 
Property / cites work: Optimal control of a marketing-production system / rank
 
Normal rank

Latest revision as of 23:07, 24 June 2024

scientific article
Language Label Description Also known as
English
A two-level hedging point policy for controlling a manufacturing system with time-delay, demand uncertainty and extra capacity
scientific article

    Statements

    A two-level hedging point policy for controlling a manufacturing system with time-delay, demand uncertainty and extra capacity (English)
    0 references
    0 references
    0 references
    0 references
    15 November 2006
    0 references
    0 references
    control
    0 references
    production
    0 references
    networked manufacturing systems
    0 references
    time-delay
    0 references
    hedging point policy
    0 references
    0 references