A study of repairable parts inventory system operating under performance-based contract (Q2275817): Difference between revisions

From MaRDI portal
Importer (talk | contribs)
Created a new Item
 
Import241208061232 (talk | contribs)
Normalize DOI.
 
(4 intermediate revisions by 4 users not shown)
Property / DOI
 
Property / DOI: 10.1016/j.ejor.2011.04.035 / rank
Normal rank
 
Property / MaRDI profile type
 
Property / MaRDI profile type: MaRDI publication profile / rank
 
Normal rank
Property / full work available at URL
 
Property / full work available at URL: https://doi.org/10.1016/j.ejor.2011.04.035 / rank
 
Normal rank
Property / OpenAlex ID
 
Property / OpenAlex ID: W2049868885 / rank
 
Normal rank
Property / cites work
 
Property / cites work: Modeling Emergency Supply Flexibility in a Two-Echelon Inventory System / rank
 
Normal rank
Property / cites work
 
Property / cites work: Base stock level determination for high cost low demand critical repairable spares / rank
 
Normal rank
Property / cites work
 
Property / cites work: Models for multi-echelon repairable item inventory systems with limited repair capacity / rank
 
Normal rank
Property / cites work
 
Property / cites work: On Some Common Interests Among Reliability, Inventory, and Queuing / rank
 
Normal rank
Property / cites work
 
Property / cites work: Steady-state approximations for multi-echelon multi-indentured repairable-item inventory system / rank
 
Normal rank
Property / cites work
 
Property / cites work: Performance Contracting in After-Sales Service Supply Chains / rank
 
Normal rank
Property / cites work
 
Property / cites work: A Model for a Multi-Item, Multi-Echelon, Multi-Indenture Inventory System / rank
 
Normal rank
Property / cites work
 
Property / cites work: Spares provisioning under performance-based logistics contract: profit-centric approach / rank
 
Normal rank
Property / cites work
 
Property / cites work: Optimization of component reliability in the design phase of capital goods / rank
 
Normal rank
Property / cites work
 
Property / cites work: Trade-off between inventory and repair capacity in spare part networks / rank
 
Normal rank
Property / cites work
 
Property / cites work: A Two-Echelon Repairable Inventory System with Stocking-Center-Dependent Depot Replenishment Lead Times / rank
 
Normal rank
Property / DOI
 
Property / DOI: 10.1016/J.EJOR.2011.04.035 / rank
 
Normal rank
links / mardi / namelinks / mardi / name
 

Latest revision as of 19:08, 17 December 2024

scientific article
Language Label Description Also known as
English
A study of repairable parts inventory system operating under performance-based contract
scientific article

    Statements

    A study of repairable parts inventory system operating under performance-based contract (English)
    0 references
    0 references
    0 references
    10 August 2011
    0 references
    logistics
    0 references
    base stock
    0 references
    component reliability
    0 references
    repair facility
    0 references

    Identifiers