Workload planning in small lot printed circuit board assembly (Q1374396): Difference between revisions

From MaRDI portal
Import240304020342 (talk | contribs)
Set profile property.
Set OpenAlex properties.
 
(One intermediate revision by one other user not shown)
Property / cites work
 
Property / cites work: Staging Problem of a Dual Delivery Pick-and-Place Machine in Printed Circuit Card Assembly / rank
 
Normal rank
Property / cites work
 
Property / cites work: Printed circuit board family grouping and component allocation for a multimachine, open-shop assembly cell / rank
 
Normal rank
Property / cites work
 
Property / cites work: Throughput rate optimization in the automated assembly of printed circuit boards / rank
 
Normal rank
Property / cites work
 
Property / cites work: Q4836340 / rank
 
Normal rank
Property / cites work
 
Property / cites work: The traveling salesman problem: An overview of exact and approximate algorithms / rank
 
Normal rank
Property / cites work
 
Property / cites work: Set-up saving schemes for printed circuit boards assembly / rank
 
Normal rank
Property / cites work
 
Property / cites work: Hierarchical structures in organizations: A conceptual framework / rank
 
Normal rank
Property / cites work
 
Property / cites work: Models Arising from a Flexible Manufacturing Machine, Part I: Minimization of the Number of Tool Switches / rank
 
Normal rank
Property / cites work
 
Property / cites work: An Adaptable Scheduling Algorithm for Flexible Flow Lines / rank
 
Normal rank
Property / full work available at URL
 
Property / full work available at URL: https://doi.org/10.1007/bf01545517 / rank
 
Normal rank
Property / OpenAlex ID
 
Property / OpenAlex ID: W2055471288 / rank
 
Normal rank

Latest revision as of 12:12, 30 July 2024

scientific article
Language Label Description Also known as
English
Workload planning in small lot printed circuit board assembly
scientific article

    Statements

    Workload planning in small lot printed circuit board assembly (English)
    0 references
    0 references
    0 references
    0 references
    0 references
    0 references
    1997
    0 references
    0 references
    0 references
    0 references
    0 references
    0 references
    workload planning
    0 references
    printed circuit board assembly
    0 references
    fuzzy approach
    0 references
    interactive decision support system
    0 references
    0 references