Loading tow trains ergonomically for just-in-time part supply (Q2301970): Difference between revisions

From MaRDI portal
Importer (talk | contribs)
Created a new Item
 
Normalize DOI.
 
(5 intermediate revisions by 5 users not shown)
Property / DOI
 
Property / DOI: 10.1016/j.ejor.2019.12.009 / rank
Normal rank
 
Property / MaRDI profile type
 
Property / MaRDI profile type: MaRDI publication profile / rank
 
Normal rank
Property / full work available at URL
 
Property / full work available at URL: https://doi.org/10.1016/j.ejor.2019.12.009 / rank
 
Normal rank
Property / OpenAlex ID
 
Property / OpenAlex ID: W2995899814 / rank
 
Normal rank
Property / Wikidata QID
 
Property / Wikidata QID: Q126584848 / rank
 
Normal rank
Property / cites work
 
Property / cites work: A facet generation and relaxation technique applied to an assignment problem with side constraints / rank
 
Normal rank
Property / cites work
 
Property / cites work: Some Facets for an Assignment Problem with Side Constraints / rank
 
Normal rank
Property / cites work
 
Property / cites work: The theory of dynamic programming / rank
 
Normal rank
Property / cites work
 
Property / cites work: Part logistics in the automotive industry: decision problems, literature review and research agenda / rank
 
Normal rank
Property / cites work
 
Property / cites work: A survey of algorithms for the generalized assignment problem / rank
 
Normal rank
Property / cites work
 
Property / cites work: Scheduling the replenishment of just-in-time supermarkets in assembly plants / rank
 
Normal rank
Property / cites work
 
Property / cites work: Optimally routing and scheduling tow trains for JIT-supply of mixed-model assembly lines / rank
 
Normal rank
Property / cites work
 
Property / cites work: Scheduling in-house transport vehicles to feed parts to automotive assembly lines / rank
 
Normal rank
Property / cites work
 
Property / cites work: Resource assignment with preference conditions / rank
 
Normal rank
Property / cites work
 
Property / cites work: Greedy randomized adaptive search procedures / rank
 
Normal rank
Property / cites work
 
Property / cites work: Repairing MIP infeasibility through local branching / rank
 
Normal rank
Property / cites work
 
Property / cites work: Variable Sized Bin Packing / rank
 
Normal rank
Property / cites work
 
Property / cites work: Q4198056 / rank
 
Normal rank
Property / cites work
 
Property / cites work: An integrated model to improve ergonomic and economic performance in order picking by rotating pallets / rank
 
Normal rank
Property / cites work
 
Property / cites work: Algorithms for the Assignment and Transportation Problems / rank
 
Normal rank
Property / cites work
 
Property / cites work: Ergonomic workplace design in the fast pick area / rank
 
Normal rank
Property / cites work
 
Property / cites work: Assignment problems: a golden anniversary survey / rank
 
Normal rank
Property / cites work
 
Property / cites work: Multi-criteria assignment problem with incompatibility and capacity constraints / rank
 
Normal rank
Property / DOI
 
Property / DOI: 10.1016/J.EJOR.2019.12.009 / rank
 
Normal rank
links / mardi / namelinks / mardi / name
 

Latest revision as of 21:38, 17 December 2024

scientific article
Language Label Description Also known as
English
Loading tow trains ergonomically for just-in-time part supply
scientific article

    Statements

    Loading tow trains ergonomically for just-in-time part supply (English)
    0 references
    0 references
    0 references
    0 references
    25 February 2020
    0 references
    assignment
    0 references
    tow trains
    0 references
    ergonomics
    0 references
    generalized assignment problem
    0 references
    part feeding
    0 references

    Identifiers

    0 references
    0 references
    0 references
    0 references
    0 references
    0 references
    0 references
    0 references