An efficient three-level heuristic for the large-scaled multi-product production routing problem with outsourcing (Q1991216): Difference between revisions

From MaRDI portal
Import240304020342 (talk | contribs)
Set profile property.
Normalize DOI.
 
(3 intermediate revisions by 3 users not shown)
Property / DOI
 
Property / DOI: 10.1016/j.ejor.2018.07.018 / rank
Normal rank
 
Property / full work available at URL
 
Property / full work available at URL: https://doi.org/10.1016/j.ejor.2018.07.018 / rank
 
Normal rank
Property / OpenAlex ID
 
Property / OpenAlex ID: W2884549505 / rank
 
Normal rank
Property / Wikidata QID
 
Property / Wikidata QID: Q57185569 / rank
 
Normal rank
Property / cites work
 
Property / cites work: Formulations and Branch-and-Cut Algorithms for Multivehicle Production and Inventory Routing Problems / rank
 
Normal rank
Property / cites work
 
Property / cites work: Benders Decomposition for Production Routing Under Demand Uncertainty / rank
 
Normal rank
Property / cites work
 
Property / cites work: The production routing problem: a review of formulations and solution algorithms / rank
 
Normal rank
Property / cites work
 
Property / cites work: Analysis of the maximum level policy in a production-distribution system / rank
 
Normal rank
Property / cites work
 
Property / cites work: Tabu search with path relinking for an integrated production-distribution problem / rank
 
Normal rank
Property / cites work
 
Property / cites work: The integrated production-inventory-distribution-routing problem / rank
 
Normal rank
Property / cites work
 
Property / cites work: A branch-and-price algorithm for an integrated production and inventory routing problem / rank
 
Normal rank
Property / cites work
 
Property / cites work: A reactive GRASP and path relinking for a combined production-distribution problem / rank
 
Normal rank
Property / cites work
 
Property / cites work: A memetic algorithm with dynamic population management for an integrated production-distribution problem / rank
 
Normal rank
Property / cites work
 
Property / cites work: A Dynamic Distribution Model with Warehouse and Customer Replenishment Requirements / rank
 
Normal rank
Property / cites work
 
Property / cites work: Coordination of production and distribution planning / rank
 
Normal rank
Property / cites work
 
Property / cites work: Synchronized Development of Production, Inventory, and Distribution Schedules / rank
 
Normal rank
Property / cites work
 
Property / cites work: A Tabu Search Heuristic for the Vehicle Routing Problem / rank
 
Normal rank
Property / cites work
 
Property / cites work: Very large-scale vehicle routing: new test problems, algorithms, and results / rank
 
Normal rank
Property / cites work
 
Property / cites work: An Effective Heuristic Algorithm for the Traveling-Salesman Problem / rank
 
Normal rank
Property / cites work
 
Property / cites work: Solving a multi-level capacitated lot sizing problem with multi-period setup carry-over via a fix-and-optimize heuristic / rank
 
Normal rank
Property / cites work
 
Property / cites work: Q3646775 / rank
 
Normal rank
Property / cites work
 
Property / cites work: A multi-phase heuristic for the production routing problem / rank
 
Normal rank
Property / cites work
 
Property / cites work: Coordinated supply chain management / rank
 
Normal rank
Property / cites work
 
Property / cites work: Multiscale production routing in multicommodity supply chains with complex production facilities / rank
 
Normal rank
Property / DOI
 
Property / DOI: 10.1016/J.EJOR.2018.07.018 / rank
 
Normal rank

Latest revision as of 16:47, 16 December 2024

scientific article
Language Label Description Also known as
English
An efficient three-level heuristic for the large-scaled multi-product production routing problem with outsourcing
scientific article

    Statements

    An efficient three-level heuristic for the large-scaled multi-product production routing problem with outsourcing (English)
    0 references
    0 references
    0 references
    0 references
    0 references
    30 October 2018
    0 references
    supply chain management
    0 references
    production routing
    0 references
    multi-product
    0 references
    outsourcing
    0 references
    three-level matheuristic
    0 references
    0 references

    Identifiers

    0 references
    0 references
    0 references
    0 references
    0 references
    0 references
    0 references