Flow shops with reentry: reversibility properties and makespan optimal schedules (Q2282537): Difference between revisions

From MaRDI portal
Import240304020342 (talk | contribs)
Set profile property.
Created claim: Wikidata QID (P12): Q127199374, #quickstatements; #temporary_batch_1722261696779
 
(2 intermediate revisions by 2 users not shown)
Property / full work available at URL
 
Property / full work available at URL: https://doi.org/10.1016/j.ejor.2019.09.036 / rank
 
Normal rank
Property / OpenAlex ID
 
Property / OpenAlex ID: W2975789014 / rank
 
Normal rank
Property / cites work
 
Property / cites work: Minimizing makespan on a two-machine re-entrant flowshop / rank
 
Normal rank
Property / cites work
 
Property / cites work: Minimizing makespan on an \(m\)-machine re-entrant flowshop / rank
 
Normal rank
Property / cites work
 
Property / cites work: Minimizing total tardiness on a two-machine re-entrant flowshop / rank
 
Normal rank
Property / cites work
 
Property / cites work: Decomposition methods for reentrant flow shops with sequence-dependent setup times / rank
 
Normal rank
Property / cites work
 
Property / cites work: The Complexity of Flowshop and Jobshop Scheduling / rank
 
Normal rank
Property / cites work
 
Property / cites work: The three-machine proportionate flow shop problem with unequal machine speeds / rank
 
Normal rank
Property / cites work
 
Property / cites work: The Total Tardiness Problem: Review and Extensions / rank
 
Normal rank
Property / cites work
 
Property / cites work: The three-machine proportionate open shop and mixed shop minimum makespan problems / rank
 
Normal rank
Property / cites work
 
Property / cites work: Mean Flow Time Minimization in Reentrant Job Shops with a Hub / rank
 
Normal rank
Property / cites work
 
Property / cites work: Minimizing makespan in hybrid flowshops / rank
 
Normal rank
Property / cites work
 
Property / cites work: V-shop scheduling / rank
 
Normal rank
Property / cites work
 
Property / cites work: Batch scheduling in the no-wait two-machine flowshop to minimize the makespan / rank
 
Normal rank
Property / cites work
 
Property / cites work: The Reversibility Property of Production Lines / rank
 
Normal rank
Property / cites work
 
Property / cites work: Focused Scheduling in Proportionate Flowshops / rank
 
Normal rank
Property / cites work
 
Property / cites work: Minimizing makespan in re-entrant permutation flow-shops / rank
 
Normal rank
Property / cites work
 
Property / cites work: Review of the ordered and proportionate flow shop scheduling research / rank
 
Normal rank
Property / cites work
 
Property / cites work: Minimizing the Expected Makespan in Stochastic Flow Shops / rank
 
Normal rank
Property / cites work
 
Property / cites work: A Note on Stochastic Shop Models in Which Jobs have the Same Processing Requirements on Each Machine / rank
 
Normal rank
Property / cites work
 
Property / cites work: Scheduling / rank
 
Normal rank
Property / cites work
 
Property / cites work: Minimizing total weighted completion time in a proportionate flow shop / rank
 
Normal rank
Property / cites work
 
Property / cites work: Flowshop Sequencing Problem with Ordered Processing Time Matrices / rank
 
Normal rank
Property / cites work
 
Property / cites work: Minimizing Makespan in a Class of Reentrant Shops / rank
 
Normal rank
Property / cites work
 
Property / cites work: A Broader View of the Job-Shop Scheduling Problem / rank
 
Normal rank
Property / cites work
 
Property / cites work: Multi-family scheduling in a two-machine reentrant flow shop with setups / rank
 
Normal rank
Property / Wikidata QID
 
Property / Wikidata QID: Q127199374 / rank
 
Normal rank

Latest revision as of 16:02, 29 July 2024

scientific article
Language Label Description Also known as
English
Flow shops with reentry: reversibility properties and makespan optimal schedules
scientific article

    Statements

    Flow shops with reentry: reversibility properties and makespan optimal schedules (English)
    0 references
    0 references
    0 references
    8 January 2020
    0 references
    scheduling
    0 references
    job reentry
    0 references
    ordered flow shop
    0 references
    proportionate flow shop
    0 references
    0 references
    0 references

    Identifiers