Measures of problem uncertainty for scheduling with interval processing times (Q2393127): Difference between revisions

From MaRDI portal
Importer (talk | contribs)
Created a new Item
 
ReferenceBot (talk | contribs)
Changed an Item
 
(6 intermediate revisions by 5 users not shown)
Property / author
 
Property / author: Yuri N. Sotskov / rank
Normal rank
 
Property / author
 
Property / author: Yuri N. Sotskov / rank
 
Normal rank
Property / MaRDI profile type
 
Property / MaRDI profile type: MaRDI publication profile / rank
 
Normal rank
Property / full work available at URL
 
Property / full work available at URL: https://doi.org/10.1007/s00291-012-0306-3 / rank
 
Normal rank
Property / OpenAlex ID
 
Property / OpenAlex ID: W2001669035 / rank
 
Normal rank
Property / Wikidata QID
 
Property / Wikidata QID: Q57633817 / rank
 
Normal rank
Property / cites work
 
Property / cites work: Executing production schedules in the face of uncertainties: a review and some future directions / rank
 
Normal rank
Property / cites work
 
Property / cites work: Robust Scheduling to Hedge Against Processing Time Uncertainty in Single-Stage Production / rank
 
Normal rank
Property / cites work
 
Property / cites work: Scheduling arrivals to a production system in a fuzzy environment / rank
 
Normal rank
Property / cites work
 
Property / cites work: Workload based order acceptance in job shop environments / rank
 
Normal rank
Property / cites work
 
Property / cites work: One machine scheduling problem with fuzzy random due-dates / rank
 
Normal rank
Property / cites work
 
Property / cites work: Makespan estimation and order acceptance in batch process industries when processing times are uncertain / rank
 
Normal rank
Property / cites work
 
Property / cites work: Optimal two- and three-stage production schedules with setup times included / rank
 
Normal rank
Property / cites work
 
Property / cites work: Minimizing maximal regret in the single machine sequencing problem with maximum lateness criterion / rank
 
Normal rank
Property / cites work
 
Property / cites work: A 2-approximation algorithm for interval data minmax regret sequencing problems with the total flow time criterion / rank
 
Normal rank
Property / cites work
 
Property / cites work: Robust discrete optimization and its applications / rank
 
Normal rank
Property / cites work
 
Property / cites work: Sequencing with uncertain numerical data for makespan minimisation / rank
 
Normal rank
Property / cites work
 
Property / cites work: The dominance digraph as a solution to the two-machine flow-shop problem with interval processing times / rank
 
Normal rank
Property / cites work
 
Property / cites work: TWO-MACHINE FLOW-SHOP MINIMUM-LENGTH SCHEDULING WITH INTERVAL PROCESSING TIMES / rank
 
Normal rank
Property / cites work
 
Property / cites work: Q3525911 / rank
 
Normal rank
Property / cites work
 
Property / cites work: Scheduling under fuzziness / rank
 
Normal rank
Property / cites work
 
Property / cites work: Minimizing total weighted flow time of a set of jobs with interval processing times / rank
 
Normal rank
Property / cites work
 
Property / cites work: Minimizing total weighted flow time under uncertainty using dominance and a stability box / rank
 
Normal rank
Property / cites work
 
Property / cites work: A comparison of stochastic programming and bi-objective optimisation approaches to robust airline crew scheduling / rank
 
Normal rank
Property / cites work
 
Property / cites work: Q4323632 / rank
 
Normal rank
Property / cites work
 
Property / cites work: Q4841579 / rank
 
Normal rank
Property / cites work
 
Property / cites work: On the robust single machine scheduling problem / rank
 
Normal rank
links / mardi / namelinks / mardi / name
 

Latest revision as of 18:16, 6 July 2024

scientific article
Language Label Description Also known as
English
Measures of problem uncertainty for scheduling with interval processing times
scientific article

    Statements

    Measures of problem uncertainty for scheduling with interval processing times (English)
    0 references
    0 references
    0 references
    0 references
    0 references
    7 August 2013
    0 references
    scheduling
    0 references
    interval processing times
    0 references
    uncertainty measure
    0 references
    0 references
    0 references
    0 references

    Identifiers