Production planning with load dependent lead times: An update of research (Q2480264): Difference between revisions

From MaRDI portal
Importer (talk | contribs)
Created a new Item
 
ReferenceBot (talk | contribs)
Changed an Item
 
(3 intermediate revisions by 3 users not shown)
Property / MaRDI profile type
 
Property / MaRDI profile type: MaRDI publication profile / rank
 
Normal rank
Property / full work available at URL
 
Property / full work available at URL: https://doi.org/10.1007/s10479-007-0173-5 / rank
 
Normal rank
Property / OpenAlex ID
 
Property / OpenAlex ID: W2075824666 / rank
 
Normal rank
Property / cites work
 
Property / cites work: Dynamic Modeling and Control of Congestion-Prone Systems / rank
 
Normal rank
Property / cites work
 
Property / cites work: Production planning with resources subject to congestion / rank
 
Normal rank
Property / cites work
 
Property / cites work: Palm probabilities and stationary queues / rank
 
Normal rank
Property / cites work
 
Property / cites work: Inventory Models Involving Lead Time as a Decision Variable / rank
 
Normal rank
Property / cites work
 
Property / cites work: From fluid relaxations to practical algorithms for job shop scheduling: The makespan objective / rank
 
Normal rank
Property / cites work
 
Property / cites work: Mathematical Programming Approaches to Capacity-Constrained MRP Systems: Review, Formulation and Problem Reduction / rank
 
Normal rank
Property / cites work
 
Property / cites work: Hierarchical Production Planning: A Single Stage System / rank
 
Normal rank
Property / cites work
 
Property / cites work: Hierarchical Production Planning: A Two-Stage System / rank
 
Normal rank
Property / cites work
 
Property / cites work: Q5485392 / rank
 
Normal rank
Property / cites work
 
Property / cites work: Quantifying the Bullwhip Effect in a Simple Supply Chain: The Impact of Forecasting, Lead Times, and Information / rank
 
Normal rank
Property / cites work
 
Property / cites work: A Heuristic for a Resource-capacitated Multi-stage Lot-sizing Problem with Lead Times / rank
 
Normal rank
Property / cites work
 
Property / cites work: On the importance of sequencing decisions in production planning and scheduling / rank
 
Normal rank
Property / cites work
 
Property / cites work: Q3410593 / rank
 
Normal rank
Property / cites work
 
Property / cites work: Analytical Evaluation of Hierarchical Planning Systems / rank
 
Normal rank
Property / cites work
 
Property / cites work: A Tactical Planning Model for a Job Shop / rank
 
Normal rank
Property / cites work
 
Property / cites work: Supply Chain Scheduling: Batching and Delivery / rank
 
Normal rank
Property / cites work
 
Property / cites work: Job Release: Part of a Hierarchical System to Manage Manufacturing Lead Times in Make-to-order Companies / rank
 
Normal rank
Property / cites work
 
Property / cites work: Finding Optimal Material Release Times Using Simulation-Based Optimization / rank
 
Normal rank
Property / cites work
 
Property / cites work: Finite-capacity production planning algorithms for a semiconductor wafer fabrication facility / rank
 
Normal rank
Property / cites work
 
Property / cites work: Discussion of the standard processing time / rank
 
Normal rank
Property / cites work
 
Property / cites work: Definition and properties of the input-weighted average lead-time / rank
 
Normal rank
Property / cites work
 
Property / cites work: Lot Sizes, Lead Times and In-Process Inventories / rank
 
Normal rank
Property / cites work
 
Property / cites work: Batching to Minimize Flow Times on Parallel Heterogeneous Machines / rank
 
Normal rank
Property / cites work
 
Property / cites work: Q3995531 / rank
 
Normal rank
Property / cites work
 
Property / cites work: Dynamic Release Control Policy for the Semiconductor Wafer Fabrication Lines / rank
 
Normal rank
Property / cites work
 
Property / cites work: Kanban-controlled manufacturing systems. / rank
 
Normal rank
Property / cites work
 
Property / cites work: Information Distortion in a Supply Chain: The Bullwhip Effect / rank
 
Normal rank
Property / cites work
 
Property / cites work: An Empirical Investigation of the Transient Behavior of Stationary Queueing Systems / rank
 
Normal rank
Property / cites work
 
Property / cites work: Mixture Inventory Model with Backorders and Lost Sales for Variable Lead Time / rank
 
Normal rank
Property / cites work
 
Property / cites work: Manufacturing lead time estimation using data mining / rank
 
Normal rank
Property / cites work
 
Property / cites work: Production planning with load dependent lead times / rank
 
Normal rank
Property / cites work
 
Property / cites work: Optimal Lead Time Policies / rank
 
Normal rank
Property / cites work
 
Property / cites work: Dynamic metamodelling in capacity planning / rank
 
Normal rank
Property / cites work
 
Property / cites work: Improving supply-chain performance by sharing advance demand information / rank
 
Normal rank
Property / cites work
 
Property / cites work: Q3378954 / rank
 
Normal rank
Property / cites work
 
Property / cites work: Dynamic Version of the Economic Lot Size Model / rank
 
Normal rank
Property / cites work
 
Property / cites work: Simple heuristics for scheduling with limited intermediate storage / rank
 
Normal rank
Property / cites work
 
Property / cites work: Setting Planned Leadtimes in Serial Production Systems with Tardiness Costs / rank
 
Normal rank
Property / cites work
 
Property / cites work: Lead times, order release mechanisms, and customer service / rank
 
Normal rank
Property / cites work
 
Property / cites work: The impact of forecasting model selection on the value of information sharing in a supply chain / rank
 
Normal rank
links / mardi / namelinks / mardi / name
 

Latest revision as of 20:33, 27 June 2024

scientific article
Language Label Description Also known as
English
Production planning with load dependent lead times: An update of research
scientific article

    Statements

    Production planning with load dependent lead times: An update of research (English)
    0 references
    0 references
    0 references
    0 references
    31 March 2008
    0 references
    0 references
    0 references
    0 references
    0 references
    production planning
    0 references
    load dependent lead times
    0 references
    mathematical programming
    0 references
    supply chain management
    0 references
    0 references
    0 references
    0 references
    0 references
    0 references