Inspection resource assignment in a multistage manufacturing system with an inspection error model (Q4656114): Difference between revisions
From MaRDI portal
Set profile property. |
ReferenceBot (talk | contribs) Changed an Item |
||
(One intermediate revision by one other user not shown) | |||
Property / full work available at URL | |||
Property / full work available at URL: https://doi.org/10.1080/00207540110119982 / rank | |||
Normal rank | |||
Property / OpenAlex ID | |||
Property / OpenAlex ID: W1990313818 / rank | |||
Normal rank | |||
Property / cites work | |||
Property / cites work: Inspection for Circuit Board Assembly / rank | |||
Normal rank | |||
Property / cites work | |||
Property / cites work: Planning quality inspection operations in multistage manufacturing systems with inspection errors / rank | |||
Normal rank | |||
Property / cites work | |||
Property / cites work: Optimal inspection policies in a serial production system including scrap rework and repair: An MILP approach / rank | |||
Normal rank |
Latest revision as of 18:44, 7 June 2024
scientific article; zbMATH DE number 2142872
Language | Label | Description | Also known as |
---|---|---|---|
English | Inspection resource assignment in a multistage manufacturing system with an inspection error model |
scientific article; zbMATH DE number 2142872 |
Statements
Inspection resource assignment in a multistage manufacturing system with an inspection error model (English)
0 references
8 March 2005
0 references