RELIABILITY CENTERED MULTI OBJECTIVE HYBRID FLOW SHOP SCHEDULING (Q5850789): Difference between revisions

From MaRDI portal
Added link to MaRDI item.
Set OpenAlex properties.
 
(One intermediate revision by one other user not shown)
Property / cites work
 
Property / cites work: On estimating the mean function of a Gaussian process / rank
 
Normal rank
Property / cites work
 
Property / cites work: Improving job-shop schedules through critical pairwise exchanges / rank
 
Normal rank
Property / cites work
 
Property / cites work: Dispatching rules in scheduling Dispatching rules in scheduling: a fuzzy approach / rank
 
Normal rank
Property / cites work
 
Property / cites work: Local search heuristics for two-stage flow shop problems with secondary criterion / rank
 
Normal rank
Property / cites work
 
Property / cites work: Fuzzy sets / rank
 
Normal rank
Property / full work available at URL
 
Property / full work available at URL: https://doi.org/10.1142/s0217595909002389 / rank
 
Normal rank
Property / OpenAlex ID
 
Property / OpenAlex ID: W2061254500 / rank
 
Normal rank

Latest revision as of 09:27, 30 July 2024

scientific article; zbMATH DE number 5658766
Language Label Description Also known as
English
RELIABILITY CENTERED MULTI OBJECTIVE HYBRID FLOW SHOP SCHEDULING
scientific article; zbMATH DE number 5658766

    Statements

    RELIABILITY CENTERED MULTI OBJECTIVE HYBRID FLOW SHOP SCHEDULING (English)
    0 references
    0 references
    0 references
    15 January 2010
    0 references
    hybrid flow shop
    0 references
    fuzzy inference systems (FIS)
    0 references
    reliability
    0 references
    availability
    0 references

    Identifiers