Scheduling a two-stage flowshop under makespan constraint (Q2476691): Difference between revisions

From MaRDI portal
Set OpenAlex properties.
ReferenceBot (talk | contribs)
Changed an Item
 
Property / cites work
 
Property / cites work: Q4658190 / rank
 
Normal rank
Property / cites work
 
Property / cites work: Symposium on the theory of scheduling and its applications / rank
 
Normal rank
Property / cites work
 
Property / cites work: Optimal two- and three-stage production schedules with setup times included / rank
 
Normal rank
Property / cites work
 
Property / cites work: A Heuristic Algorithm for the <i>n</i> Job, <i>m</i> Machine Sequencing Problem / rank
 
Normal rank
Property / cites work
 
Property / cites work: A Functional Equation and its Application to Resource Allocation and Sequencing Problems / rank
 
Normal rank
Property / cites work
 
Property / cites work: The two-machine flowshop scheduling problem with total tardiness / rank
 
Normal rank
Property / cites work
 
Property / cites work: Selecting jobs for heavily loaded shop with lateness penalties / rank
 
Normal rank
Property / cites work
 
Property / cites work: Minimizing tardy jobs in a flowshop with common due date / rank
 
Normal rank
Property / cites work
 
Property / cites work: Inference-Based Sensitivity Analysis for Mixed Integer/Linear Programming / rank
 
Normal rank
Property / cites work
 
Property / cites work: Q4198056 / rank
 
Normal rank
Property / cites work
 
Property / cites work: Scheduling shops to minimize the weighted number of late jobs / rank
 
Normal rank
Property / cites work
 
Property / cites work: Q3525910 / rank
 
Normal rank
Property / cites work
 
Property / cites work: Q3993418 / rank
 
Normal rank
Property / cites work
 
Property / cites work: Fast Approximation Algorithms for the Knapsack and Sum of Subset Problems / rank
 
Normal rank
Property / cites work
 
Property / cites work: Resource-constrained multi-project scheduling with tardy costs: Comparing myopic, bottleneck, and resource pricing heuristics / rank
 
Normal rank
Property / cites work
 
Property / cites work: The Asymptotic Optimality of the SPT Rule for the Flow Shop Mean Completion Time Problem / rank
 
Normal rank

Latest revision as of 19:10, 27 June 2024

scientific article
Language Label Description Also known as
English
Scheduling a two-stage flowshop under makespan constraint
scientific article

    Statements

    Scheduling a two-stage flowshop under makespan constraint (English)
    0 references
    0 references
    12 March 2008
    0 references
    0 references
    scheduling
    0 references
    flowshop
    0 references
    heuristics
    0 references
    approximation algorithms
    0 references
    0 references