Priority rule-based heuristic for multi-mode resource-constrained project scheduling problems with resource vacations and activity splitting (Q859913): Difference between revisions

From MaRDI portal
Set OpenAlex properties.
Import241208061232 (talk | contribs)
Normalize DOI.
 
(3 intermediate revisions by 3 users not shown)
Property / DOI
 
Property / DOI: 10.1016/j.ejor.2006.02.010 / rank
Normal rank
 
Property / full work available at URL
 
Property / full work available at URL: https://doi.org/10.1016/j.ejor.2006.02.010 / rank
Normal rank
 
Property / OpenAlex ID
 
Property / OpenAlex ID: W2085255257 / rank
Normal rank
 
Property / full work available at URL
 
Property / full work available at URL: https://doi.org/10.1016/j.ejor.2006.02.010 / rank
 
Normal rank
Property / OpenAlex ID
 
Property / OpenAlex ID: W2085255257 / rank
 
Normal rank
Property / cites work
 
Property / cites work: Solving the Multi-Mode Resource-Constrained Project Scheduling Problem with genetic algorithms / rank
 
Normal rank
Property / cites work
 
Property / cites work: Some efficient multi-heuristic procedures for resource-constrained project scheduling / rank
 
Normal rank
Property / cites work
 
Property / cites work: A new and efficient heuristic for scheduling projects with resource restrictions and multiple execution modes / rank
 
Normal rank
Property / cites work
 
Property / cites work: Project Scheduling Under Partially Renewable Resource Constraints / rank
 
Normal rank
Property / cites work
 
Property / cites work: A new efficient simulated annealing algorithm for the resource-constrained project scheduling problem and its multiple mode version. / rank
 
Normal rank
Property / cites work
 
Property / cites work: Resource-constrained project scheduling: Notation, classification, models, and methods / rank
 
Normal rank
Property / cites work
 
Property / cites work: Properties of multi-mode resource-constrained project scheduling problems with resource vacations and activity splitting / rank
 
Normal rank
Property / cites work
 
Property / cites work: Scheduling of Project Networks by Job Assignment / rank
 
Normal rank
Property / cites work
 
Property / cites work: Project scheduling under limited resources. Models, methods, and applications / rank
 
Normal rank
Property / cites work
 
Property / cites work: Project scheduling with multiple modes: A genetic algorithm / rank
 
Normal rank
Property / cites work
 
Property / cites work: Resource-constrained project scheduling: A heuristic for the multi-mode case / rank
 
Normal rank
Property / cites work
 
Property / cites work: Simulated annealing for multi-mode resource-constrained project scheduling / rank
 
Normal rank
Property / cites work
 
Property / cites work: Serial and parallel resource-constrained project scheduling methods revisited: Theory and computation / rank
 
Normal rank
Property / cites work
 
Property / cites work: Characterization and Generation of a General Class of Resource-Constrained Project Scheduling Problems / rank
 
Normal rank
Property / cites work
 
Property / cites work: Simulated annealing and tabu search for multi-mode resource-constrained project scheduling with positive discounted cash flows and different payment models / rank
 
Normal rank
Property / DOI
 
Property / DOI: 10.1016/J.EJOR.2006.02.010 / rank
 
Normal rank

Latest revision as of 05:42, 10 December 2024

scientific article
Language Label Description Also known as
English
Priority rule-based heuristic for multi-mode resource-constrained project scheduling problems with resource vacations and activity splitting
scientific article

    Statements

    Priority rule-based heuristic for multi-mode resource-constrained project scheduling problems with resource vacations and activity splitting (English)
    0 references
    0 references
    22 January 2007
    0 references
    project scheduling
    0 references
    heuristics
    0 references
    priority rules
    0 references
    moving resource strength
    0 references

    Identifiers