MIP-based heuristics for multi-item capacitated lot-sizing problem with setup times and shortage costs (Q3598683): Difference between revisions

From MaRDI portal
Set OpenAlex properties.
ReferenceBot (talk | contribs)
Changed an Item
 
Property / cites work
 
Property / cites work: MIP-based heuristics for multi-item capacitated lot-sizing problem with setup times and shortage costs / rank
 
Normal rank
Property / cites work
 
Property / cites work: The single-item lot-sizing problem with immediate lost sales / rank
 
Normal rank
Property / cites work
 
Property / cites work: bc — prod: A Specialized Branch-and-Cut System for Lot-Sizing Problems / rank
 
Normal rank
Property / cites work
 
Property / cites work: Computational Complexity of the Capacitated Lot Size Problem / rank
 
Normal rank
Property / cites work
 
Property / cites work: Single item lot sizing problems / rank
 
Normal rank
Property / cites work
 
Property / cites work: Analysis of relaxations for the multi-item capacitated lot-sizing problem / rank
 
Normal rank
Property / cites work
 
Property / cites work: Capacitated lot-sizing and scheduling by Lagrangean relaxation / rank
 
Normal rank
Property / cites work
 
Property / cites work: Deterministic Production Planning: Algorithms and Complexity / rank
 
Normal rank
Property / cites work
 
Property / cites work: Q4139966 / rank
 
Normal rank
Property / cites work
 
Property / cites work: Facets and algorithms for capacitated lot sizing / rank
 
Normal rank
Property / cites work
 
Property / cites work: The uncapacitated lot-sizing problem with sales and safety stocks / rank
 
Normal rank
Property / cites work
 
Property / cites work: On the polyhedral structure of a multi-item production planning model with setup times / rank
 
Normal rank
Property / cites work
 
Property / cites work: Solving Multi-Item Lot-Sizing Problems Using Strong Cutting Planes / rank
 
Normal rank
Property / cites work
 
Property / cites work: Efficient, Effective Lot Sizing for Multistage Production Systems / rank
 
Normal rank
Property / cites work
 
Property / cites work: A Forward Algorithm for the Capacitated Lot Size Model with Stockouts / rank
 
Normal rank
Property / cites work
 
Property / cites work: Multilevel Lot Sizing with Setup Times and Multiple Constrained Resources: Internally Rolling Schedules with Lot-Sizing Windows / rank
 
Normal rank
Property / cites work
 
Property / cites work: The Capacitated Lot-Sizing Problem with Linked Lot Sizes / rank
 
Normal rank
Property / cites work
 
Property / cites work: A General Heuristic for Production Planning Problems / rank
 
Normal rank

Latest revision as of 01:20, 29 June 2024

scientific article
Language Label Description Also known as
English
MIP-based heuristics for multi-item capacitated lot-sizing problem with setup times and shortage costs
scientific article

    Statements

    MIP-based heuristics for multi-item capacitated lot-sizing problem with setup times and shortage costs (English)
    0 references
    0 references
    0 references
    3 February 2009
    0 references
    lot-sizing
    0 references
    setup time
    0 references
    shortage cost
    0 references
    safety stock deficit
    0 references
    production planning
    0 references
    mixed integer programming
    0 references
    heuristic
    0 references
    0 references
    0 references

    Identifiers