Exact and heuristic algorithms for the just-in-time scheduling problem in a batch processing system (Q1652207): Difference between revisions

From MaRDI portal
Set OpenAlex properties.
Normalize DOI.
 
(One intermediate revision by one other user not shown)
Property / DOI
 
Property / DOI: 10.1016/j.cor.2016.12.001 / rank
Normal rank
 
Property / cites work
 
Property / cites work: Minimizing earliness-tardiness on a single burn-in oven with a common due date and maximum allowable tardiness constraint / rank
 
Normal rank
Property / cites work
 
Property / cites work: Scheduling with batching: A review / rank
 
Normal rank
Property / cites work
 
Property / cites work: Scheduling a single batch processing machine with non-identical job sizes / rank
 
Normal rank
Property / cites work
 
Property / cites work: Minimizing the makespan on a batch machine with non-identical job sizes: An exact procedure / rank
 
Normal rank
Property / cites work
 
Property / cites work: A branch and price algorithm to minimize makespan on a single batch processing machine with non-identical job sizes / rank
 
Normal rank
Property / cites work
 
Property / cites work: Solving single batch-processing machine problems using an iterated heuristic / rank
 
Normal rank
Property / cites work
 
Property / cites work: A constraint programming approach for a batch processing problem with non-identical job sizes / rank
 
Normal rank
Property / cites work
 
Property / cites work: Split-merge: using exponential neighborhood search for scheduling a batching machine / rank
 
Normal rank
Property / cites work
 
Property / cites work: Scheduling a single machine with parallel batching to minimize makespan and total rejection cost / rank
 
Normal rank
Property / cites work
 
Property / cites work: Single batch machine scheduling with deliveries / rank
 
Normal rank
Property / cites work
 
Property / cites work: Makespan minimization on single batch-processing machine via ant colony optimization / rank
 
Normal rank
Property / cites work
 
Property / cites work: An improved meta-heuristic for makespan minimization of a single batch machine with non-identical job sizes / rank
 
Normal rank
Property / cites work
 
Property / cites work: Earliness and tardiness scheduling problems on a batch processor / rank
 
Normal rank
Property / cites work
 
Property / cites work: Decomposition heuristics for minimizing earliness-tardiness on parallel burn-in ovens with a common due date / rank
 
Normal rank
Property / cites work
 
Property / cites work: Optimization and Approximation in Deterministic Sequencing and Scheduling: a Survey / rank
 
Normal rank
Property / cites work
 
Property / cites work: Scheduling a batching machine / rank
 
Normal rank
Property / cites work
 
Property / cites work: Single- and multiple-processor models for minimizing completion time variance / rank
 
Normal rank
Property / DOI
 
Property / DOI: 10.1016/J.COR.2016.12.001 / rank
 
Normal rank

Latest revision as of 01:02, 11 December 2024

scientific article
Language Label Description Also known as
English
Exact and heuristic algorithms for the just-in-time scheduling problem in a batch processing system
scientific article

    Statements

    Exact and heuristic algorithms for the just-in-time scheduling problem in a batch processing system (English)
    0 references
    0 references
    11 July 2018
    0 references
    just-in-time scheduling
    0 references
    batch processing machine
    0 references
    branch and bound
    0 references
    dynamic programming
    0 references
    heuristic
    0 references

    Identifiers

    0 references
    0 references
    0 references
    0 references
    0 references
    0 references