Earliness-tardiness scheduling with setup considerations (Q1777159): Difference between revisions

From MaRDI portal
Set OpenAlex properties.
Import241208061232 (talk | contribs)
Normalize DOI.
 
(One intermediate revision by one other user not shown)
Property / DOI
 
Property / DOI: 10.1016/j.cor.2003.12.002 / rank
Normal rank
 
Property / cites work
 
Property / cites work: The complexity of scheduling job families about a common due date / rank
 
Normal rank
Property / cites work
 
Property / cites work: Scheduling with batch setup times and earliness-tardiness penalties / rank
 
Normal rank
Property / cites work
 
Property / cites work: Sequencing with Earliness and Tardiness Penalties: A Review / rank
 
Normal rank
Property / cites work
 
Property / cites work: Multicriteria scheduling problems: a survey / rank
 
Normal rank
Property / cites work
 
Property / cites work: One-Processor Scheduling with Symmetric Earliness and Tardiness Penalties / rank
 
Normal rank
Property / cites work
 
Property / cites work: Single-machine scheduling with early and tardy completion costs / rank
 
Normal rank
Property / cites work
 
Property / cites work: Optimal timing schedules in earliness-tardiness single machine sequencing / rank
 
Normal rank
Property / cites work
 
Property / cites work: PERT scheduling with convex cost functions. / rank
 
Normal rank
Property / cites work
 
Property / cites work: Minimizing mean tardiness and earliness in single-machine scheduling problems with unequal due dates / rank
 
Normal rank
Property / cites work
 
Property / cites work: A Branch-and-Bound Algorithm for Single-Machine Earliness–Tardiness Scheduling with Idle Time / rank
 
Normal rank
Property / cites work
 
Property / cites work: The one-machine problem with earliness and tardiness penalties / rank
 
Normal rank
Property / cites work
 
Property / cites work: A neighbourhood scheme with a compressed solution space for the early/tardy scheduling problem / rank
 
Normal rank
Property / cites work
 
Property / cites work: Tabu search for single machine scheduling with distinct due windows and weighted earliness/tardiness penalties / rank
 
Normal rank
Property / cites work
 
Property / cites work: Single machine scheduling with symmetric earliness and tardiness penalties / rank
 
Normal rank
Property / cites work
 
Property / cites work: Scheduling job families about an unrestricted common due date on a single machine / rank
 
Normal rank
Property / cites work
 
Property / cites work: A branch-and-bound algorithm for the early/tardy machine scheduling problem with a common due-date and sequence-dependent setup time / rank
 
Normal rank
Property / cites work
 
Property / cites work: A genetic algorithm for scheduling job families on a single machine with arbitrary earliness/tardiness penalties and an unrestricted common due date / rank
 
Normal rank
Property / cites work
 
Property / cites work: Early/tardy scheduling with sequence dependent setups on uniform parallel machines / rank
 
Normal rank
Property / cites work
 
Property / cites work: Algorithms for a class of single-machine weighted tardiness and earliness problems / rank
 
Normal rank
Property / cites work
 
Property / cites work: Time-Indexed Formulations for Machine Scheduling Problems: Column Generation / rank
 
Normal rank
Property / cites work
 
Property / cites work: Using short-term memory to minimize the weighted number of late jobs on a single machine. / rank
 
Normal rank
Property / cites work
 
Property / cites work: Tight LP bounds for resource constrained project scheduling / rank
 
Normal rank
Property / cites work
 
Property / cites work: The Continuous Assignment Problem and Its Application to Preemptive and Non-Preemptive Scheduling with Irregular Cost Functions / rank
 
Normal rank
Property / cites work
 
Property / cites work: Q3720313 / rank
 
Normal rank
Property / DOI
 
Property / DOI: 10.1016/J.COR.2003.12.002 / rank
 
Normal rank

Latest revision as of 10:39, 11 December 2024

scientific article
Language Label Description Also known as
English
Earliness-tardiness scheduling with setup considerations
scientific article

    Statements

    Earliness-tardiness scheduling with setup considerations (English)
    0 references
    0 references
    12 May 2005
    0 references
    Earliness-tardiness scheduling
    0 references
    Setup times
    0 references
    MIP formulation
    0 references
    Branch-and-bound
    0 references
    Heuristics
    0 references
    0 references

    Identifiers