Economic design of integrated model of control chart and maintenance management (Q949508): Difference between revisions

From MaRDI portal
Set OpenAlex properties.
Import241208061232 (talk | contribs)
Normalize DOI.
 
(One intermediate revision by one other user not shown)
Property / DOI
 
Property / DOI: 10.1016/j.mcm.2007.09.008 / rank
Normal rank
 
Property / cites work
 
Property / cites work: Q4279262 / rank
 
Normal rank
Property / cites work
 
Property / cites work: Effect of maintenance on the economic design of \(\overline x\)-control chart / rank
 
Normal rank
Property / cites work
 
Property / cites work: Joint determination of production quantity, inspection schedule, and quality control for an imperfect process with deteriorating products / rank
 
Normal rank
Property / cites work
 
Property / cites work: An integrated systems approach to process control and maintenance / rank
 
Normal rank
Property / cites work
 
Property / cites work: Optimal preventive maintenance for equipment with two quality states and general failure time distributions / rank
 
Normal rank
Property / cites work
 
Property / cites work: The Economic Design of | barX Charts used to Maintain Current Control of a Process / rank
 
Normal rank
Property / DOI
 
Property / DOI: 10.1016/J.MCM.2007.09.008 / rank
 
Normal rank

Latest revision as of 09:27, 10 December 2024

scientific article
Language Label Description Also known as
English
Economic design of integrated model of control chart and maintenance management
scientific article

    Statements

    Identifiers