Stochastic machine breakdown and discrete delivery in an imperfect inventory-production system (Q2397594): Difference between revisions

From MaRDI portal
Set OpenAlex properties.
ReferenceBot (talk | contribs)
Changed an Item
 
Property / cites work
 
Property / cites work: Economic lot sizing with the consideration of random machine unavailability time / rank
 
Normal rank
Property / cites work
 
Property / cites work: The derivation of EOQ/EPQ inventory models with two backorders costs using analytic geometry and algebra / rank
 
Normal rank
Property / cites work
 
Property / cites work: A complement to ``A comprehensive note on: an economic order quantity with imperfect quality and quantity discounts'' / rank
 
Normal rank
Property / cites work
 
Property / cites work: Joint determination of optimal safety stocks and production policy for an imperfect production system / rank
 
Normal rank
Property / cites work
 
Property / cites work: Production lot sizing with process deterioration and machine breakdown / rank
 
Normal rank
Property / cites work
 
Property / cites work: Optimal production run length for products sold with warranty in an imperfect production system with allowable shortages / rank
 
Normal rank
Property / cites work
 
Property / cites work: Mathematical modeling for determining the replenishment policy for EMQ model with rework and multiple shipments / rank
 
Normal rank
Property / cites work
 
Property / cites work: Determining the optimal run time for EPQ model with scrap, rework, and stochastic breakdowns / rank
 
Normal rank
Property / cites work
 
Property / cites work: Robust planning in optimization for production system subject to random machine breakdown and failure in rework / rank
 
Normal rank
Property / cites work
 
Property / cites work: Optimization of the finite production rate model with scrap, rework and stochastic machine breakdown / rank
 
Normal rank
Property / cites work
 
Property / cites work: Optimal design of unreliable production--inventory systems with variable production rate / rank
 
Normal rank
Property / cites work
 
Property / cites work: On a production-inventory system of deteriorating items subject to random machine breakdowns with a fixed repair time / rank
 
Normal rank
Property / cites work
 
Property / cites work: Analysis of a production-inventory system with machine breakdowns and shutdowns / rank
 
Normal rank
Property / cites work
 
Property / cites work: A genetic algorithm approach to optimize a multi-products EPQ model with discrete delivery orders and constrained space / rank
 
Normal rank
Property / cites work
 
Property / cites work: A parameter-tuned genetic algorithm for multi-product economic production quantity model with space constraint, discrete delivery orders and shortages / rank
 
Normal rank
Property / cites work
 
Property / cites work: Supply chain coordination with variable backorder, inspections, and discount policy for fixed lifetime products / rank
 
Normal rank
Property / cites work
 
Property / cites work: Effect of unequal lot sizes, variable setup cost, and carbon emission cost in a supply chain model / rank
 
Normal rank
Property / cites work
 
Property / cites work: Periodic review fuzzy inventory model with variable lead time and fuzzy demand / rank
 
Normal rank
Property / cites work
 
Property / cites work: Product inspection policy for an imperfect production system with inspection errors and warranty cost / rank
 
Normal rank
Property / cites work
 
Property / cites work: An EPQ model with inflation in an imperfect production system / rank
 
Normal rank
Property / cites work
 
Property / cites work: Multiproduct single-machine production system with stochastic scrapped production rate, partial backordering and service level constraint / rank
 
Normal rank
Property / cites work
 
Property / cites work: Optimising multi-product multi-chance-constraint inventory control system with stochastic period lengths and total discount under fuzzy purchasing price and holding costs / rank
 
Normal rank
Property / cites work
 
Property / cites work: Meta-heuristic algorithms for solving a fuzzy single-period problem / rank
 
Normal rank
Property / cites work
 
Property / cites work: Economic production quantity model with repair failure and limited capacity / rank
 
Normal rank
Property / cites work
 
Property / cites work: Solving a finite horizon EPQ problem with backorders / rank
 
Normal rank
Property / cites work
 
Property / cites work: Optimal deteriorating items production inventory models with random machine breakdown and stochastic repair time / rank
 
Normal rank
Property / cites work
 
Property / cites work: Economic order quantity model for deteriorating items with planned backorder level / rank
 
Normal rank
Property / cites work
 
Property / cites work: Optimal production and shipment models for a single-vendor--single-buyer integrated system / rank
 
Normal rank

Latest revision as of 20:24, 13 July 2024

scientific article
Language Label Description Also known as
English
Stochastic machine breakdown and discrete delivery in an imperfect inventory-production system
scientific article

    Statements

    Stochastic machine breakdown and discrete delivery in an imperfect inventory-production system (English)
    0 references
    0 references
    0 references
    0 references
    0 references
    22 May 2017
    0 references
    inventory
    0 references
    price
    0 references
    stochastic machine breakdown
    0 references
    imperfect production
    0 references
    discrete delivery
    0 references
    scrap
    0 references
    NR policy
    0 references

    Identifiers

    0 references
    0 references
    0 references
    0 references
    0 references
    0 references