Improved customer satisfaction with a hybrid dispatching rule in semiconductor back-end factories (Q3527966): Difference between revisions

From MaRDI portal
Set OpenAlex properties.
ReferenceBot (talk | contribs)
Changed an Item
 
Property / cites work
 
Property / cites work: Multi-criteria decision analysis with fuzzy pairwise comparisons / rank
 
Normal rank
Property / cites work
 
Property / cites work: A comparison of production-line control mechanisms / rank
 
Normal rank
Property / cites work
 
Property / cites work: Evaluating naval tactical missile systems by fuzzy AHP based on the grade value of membership function / rank
 
Normal rank
Property / cites work
 
Property / cites work: Evaluating attack helicopters by AHP based on linguistic variable weight / rank
 
Normal rank
Property / cites work
 
Property / cites work: The construction of production performance prediction system for semiconductor manufacturing with artificial neural networks / rank
 
Normal rank
Property / cites work
 
Property / cites work: Decomposition method application to a large scale linear programming WIP projection model / rank
 
Normal rank
Property / cites work
 
Property / cites work: A total standard WIP estimation method for wafer fabrication / rank
 
Normal rank
Property / cites work
 
Property / cites work: Optimal investment in setup reduction in manufacturing systems with WIP inventories / rank
 
Normal rank
Property / cites work
 
Property / cites work: Constraint time buffer determination model / rank
 
Normal rank
Property / cites work
 
Property / cites work: Model to determine the backup capacity of a wafer foundry / rank
 
Normal rank
Property / cites work
 
Property / cites work: A GP-AHP method for solving group decision-making fuzzy AHP problems / rank
 
Normal rank

Latest revision as of 16:53, 28 June 2024

scientific article
Language Label Description Also known as
English
Improved customer satisfaction with a hybrid dispatching rule in semiconductor back-end factories
scientific article

    Statements

    Improved customer satisfaction with a hybrid dispatching rule in semiconductor back-end factories (English)
    0 references
    0 references
    0 references
    0 references
    1 October 2008
    0 references
    semiconductor manufacturing
    0 references
    WIP balance
    0 references
    dispatching
    0 references
    fuzzy analytic hierarchy process
    0 references

    Identifiers