Heuristics for no-wait flowshops with makespan subject to mean completion time (Q2249033): Difference between revisions

From MaRDI portal
Set OpenAlex properties.
ReferenceBot (talk | contribs)
Changed an Item
 
Property / cites work
 
Property / cites work: A Survey of Machine Scheduling Problems with Blocking and No-Wait in Process / rank
 
Normal rank
Property / cites work
 
Property / cites work: Solutions to the Constrained Flowshop Sequencing Problem / rank
 
Normal rank
Property / cites work
 
Property / cites work: A No-Wait Flowshop Scheduling Heuristic to Minimize Makespan / rank
 
Normal rank
Property / cites work
 
Property / cites work: New heuristics for no-wait flowshops to minimize makespan. / rank
 
Normal rank
Property / cites work
 
Property / cites work: Some local search algorithms for no-wait flow-shop problem with makespan criterion / rank
 
Normal rank
Property / cites work
 
Property / cites work: Approximative procedures for no-wait job shop scheduling. / rank
 
Normal rank
Property / cites work
 
Property / cites work: Complete local search with limited memory algorithm for no-wait job shops to minimize makespan / rank
 
Normal rank
Property / cites work
 
Property / cites work: Heuristic algorithms for continuous flow-shop problem / rank
 
Normal rank
Property / cites work
 
Property / cites work: Solving the continuous flow-shop scheduling problem by metaheuristics. / rank
 
Normal rank
Property / cites work
 
Property / cites work: A discrete particle swarm optimization algorithm for the no-wait flowshop scheduling problem / rank
 
Normal rank
Property / cites work
 
Property / cites work: No-wait flowshops with bicriteria of makespan and total completion time / rank
 
Normal rank
Property / cites work
 
Property / cites work: Generating Experimental Data for Computational Testing with Machine Scheduling Applications / rank
 
Normal rank
Property / cites work
 
Property / cites work: Simulation-based metamodels for scheduling a dynamic job shop with sequence-dependent setup times / rank
 
Normal rank
Property / cites work
 
Property / cites work: A survey of scheduling problems with setup times or costs / rank
 
Normal rank

Latest revision as of 16:21, 8 July 2024

scientific article
Language Label Description Also known as
English
Heuristics for no-wait flowshops with makespan subject to mean completion time
scientific article

    Statements

    Heuristics for no-wait flowshops with makespan subject to mean completion time (English)
    0 references
    0 references
    0 references
    27 June 2014
    0 references
    scheduling
    0 references
    no-wait flowshop
    0 references
    heuristic
    0 references
    makespan
    0 references
    Mean completion time
    0 references

    Identifiers