Integrated real-time control of mixed-model assembly lines and their part feeding processes (Q2668772): Difference between revisions

From MaRDI portal
Set OpenAlex properties.
ReferenceBot (talk | contribs)
Changed an Item
 
Property / cites work
 
Property / cites work: Workload smoothing in simple assembly line balancing / rank
 
Normal rank
Property / cites work
 
Property / cites work: Solving the traveling repairman problem on a line with general processing times and deadlines / rank
 
Normal rank
Property / cites work
 
Property / cites work: Minimizing sequence-dependent setup costs in feeding batch processes under due date restrictions / rank
 
Normal rank
Property / cites work
 
Property / cites work: Combining traveling salesman and traveling repairman problems: a multi-objective approach based on multiple scenarios / rank
 
Normal rank
Property / cites work
 
Property / cites work: Controlling mixed-model assembly lines in real-time by using distributed systems / rank
 
Normal rank
Property / cites work
 
Property / cites work: Algorithms for real-time scheduling of jobs on mixed model assembly lines / rank
 
Normal rank
Property / cites work
 
Property / cites work: Part logistics in the automotive industry: decision problems, literature review and research agenda / rank
 
Normal rank
Property / cites work
 
Property / cites work: A classification of assembly line balancing problems / rank
 
Normal rank
Property / cites work
 
Property / cites work: Sequencing mixed-model assembly lines: survey, classification and model critique / rank
 
Normal rank
Property / cites work
 
Property / cites work: A decomposition approach for the car resequencing problem with selectivity banks / rank
 
Normal rank
Property / cites work
 
Property / cites work: Q3651735 / rank
 
Normal rank
Property / cites work
 
Property / cites work: Using real time information for effective dynamic scheduling / rank
 
Normal rank
Property / cites work
 
Property / cites work: Scheduling in-house transport vehicles to feed parts to automotive assembly lines / rank
 
Normal rank
Property / cites work
 
Property / cites work: Parallel Tabu Search for Real-Time Vehicle Routing and Dispatching / rank
 
Normal rank
Property / cites work
 
Property / cites work: Parallel Tabu Search / rank
 
Normal rank
Property / cites work
 
Property / cites work: Tabu Search—Part I / rank
 
Normal rank
Property / cites work
 
Property / cites work: Diversion Issues in Real-Time Vehicle Dispatching / rank
 
Normal rank
Property / cites work
 
Property / cites work: Q4354785 / rank
 
Normal rank
Property / cites work
 
Property / cites work: Balancing assembly lines: an industrial case study / rank
 
Normal rank
Property / cites work
 
Property / cites work: Recent Developments in Dynamic Vehicle Routing Systems / rank
 
Normal rank
Property / cites work
 
Property / cites work: Enhanced branch-bound-remember and iterative beam search algorithms for type II assembly line balancing problem / rank
 
Normal rank
Property / cites work
 
Property / cites work: Online vehicle routing and scheduling with dynamic travel times / rank
 
Normal rank
Property / cites work
 
Property / cites work: Level Schedules for Mixed-Model Assembly Lines in Just-In-Time Production Systems / rank
 
Normal rank
Property / cites work
 
Property / cites work: Variable neighborhood search / rank
 
Normal rank
Property / cites work
 
Property / cites work: A review of dynamic vehicle routing problems / rank
 
Normal rank
Property / cites work
 
Property / cites work: Scheduling / rank
 
Normal rank
Property / cites work
 
Property / cites work: Impact of vehicle tracking on a routing problem with dynamic travel times / rank
 
Normal rank
Property / cites work
 
Property / cites work: A hybrid heuristic for a multi-objective real-life car sequencing problem with painting and assembly line constraints / rank
 
Normal rank
Property / cites work
 
Property / cites work: The car sequencing problem: overview of state-of-the-art methods and industrial case-study of the ROADEF'2005 challenge problem / rank
 
Normal rank
Property / cites work
 
Property / cites work: Special cases of traveling salesman and repairman problems with time windows / rank
 
Normal rank
Property / cites work
 
Property / cites work: Balancing mixed-model assembly lines using adjacent cross-training in a demand variation environment / rank
 
Normal rank
Property / cites work
 
Property / cites work: Advanced constraint propagation for the combined car sequencing and level scheduling problem / rank
 
Normal rank

Latest revision as of 06:12, 28 July 2024

scientific article
Language Label Description Also known as
English
Integrated real-time control of mixed-model assembly lines and their part feeding processes
scientific article

    Statements

    Integrated real-time control of mixed-model assembly lines and their part feeding processes (English)
    0 references
    0 references
    0 references
    7 March 2022
    0 references
    production
    0 references
    mixed-model assembly lines
    0 references
    sequencing
    0 references
    real-time control
    0 references
    0 references
    0 references
    0 references
    0 references
    0 references

    Identifiers