Effects of kanban withdrawal policies and other factors on the performance of JIT systems—a simulation study (Q4230276): Difference between revisions

From MaRDI portal
Set OpenAlex properties.
ReferenceBot (talk | contribs)
Changed an Item
 
Property / cites work
 
Property / cites work: Maintenance policies in just-in-time manufacturing lines / rank
 
Normal rank
Property / cites work
 
Property / cites work: Tandem queues and kanban-controlled lines / rank
 
Normal rank
Property / cites work
 
Property / cites work: A Mathematical Programming Approach to a Deterministic Kanban System / rank
 
Normal rank
Property / cites work
 
Property / cites work: The Gamma Distribution and Inventory Control / rank
 
Normal rank
Property / cites work
 
Property / cites work: Economic manufacturing quantity in a just-in-time delivery system / rank
 
Normal rank
Property / cites work
 
Property / cites work: A dynamic programming model for the kanban assignment problem in a multistage multiperiod production system / rank
 
Normal rank
Property / cites work
 
Property / cites work: Basic concepts of JIT modelling / rank
 
Normal rank
Property / cites work
 
Property / cites work: Describing processing time when simulating JIT environments / rank
 
Normal rank
Property / cites work
 
Property / cites work: The pull production system: modelling and characteristics / rank
 
Normal rank
Property / cites work
 
Property / cites work: A comparative analysis of sequencing procedures for mixed-model assembly lines in a just-in-time production system / rank
 
Normal rank

Latest revision as of 18:48, 28 May 2024

scientific article; zbMATH DE number 1256573
Language Label Description Also known as
English
Effects of kanban withdrawal policies and other factors on the performance of JIT systems—a simulation study
scientific article; zbMATH DE number 1256573

    Statements

    Effects of kanban withdrawal policies and other factors on the performance of JIT systems—a simulation study (English)
    0 references
    0 references
    1 March 1999
    0 references
    0 references
    just-in-time
    0 references
    simulation study
    0 references
    JIT production control method
    0 references
    0 references