Scheduling injection molding operations with multiple resource constraints and sequence dependent setup times and costs (Q1781573): Difference between revisions

From MaRDI portal
ReferenceBot (talk | contribs)
Changed an Item
Import241208061232 (talk | contribs)
Normalize DOI.
 
Property / DOI
 
Property / DOI: 10.1016/j.cor.2004.04.012 / rank
Normal rank
 
Property / DOI
 
Property / DOI: 10.1016/J.COR.2004.04.012 / rank
 
Normal rank

Latest revision as of 11:12, 11 December 2024

scientific article
Language Label Description Also known as
English
Scheduling injection molding operations with multiple resource constraints and sequence dependent setup times and costs
scientific article

    Statements

    Scheduling injection molding operations with multiple resource constraints and sequence dependent setup times and costs (English)
    0 references
    0 references
    0 references
    27 June 2005
    0 references
    Scheduling
    0 references
    Sequence-dependent setup
    0 references
    Changeover cost
    0 references
    Multiple capacitated resources
    0 references
    0 references

    Identifiers