Cyclic multiple-robot scheduling with time-window constraints using a critical path approach (Q856208): Difference between revisions

From MaRDI portal
ReferenceBot (talk | contribs)
Changed an Item
Normalize DOI.
 
(One intermediate revision by one other user not shown)
Property / DOI
 
Property / DOI: 10.1016/j.ejor.2005.11.019 / rank
Normal rank
 
Property / DBLP publication ID
 
Property / DBLP publication ID: journals/eor/AlcaideCKLS07 / rank
 
Normal rank
Property / DOI
 
Property / DOI: 10.1016/J.EJOR.2005.11.019 / rank
 
Normal rank

Latest revision as of 02:09, 28 December 2024

scientific article
Language Label Description Also known as
English
Cyclic multiple-robot scheduling with time-window constraints using a critical path approach
scientific article

    Statements

    Cyclic multiple-robot scheduling with time-window constraints using a critical path approach (English)
    0 references
    0 references
    0 references
    0 references
    0 references
    0 references
    7 December 2006
    0 references
    production-transportation process
    0 references
    cyclic scheduling
    0 references
    robotic scheduling
    0 references
    parametric PERT-CPM model
    0 references
    time windows
    0 references
    critical path
    0 references

    Identifiers