Hybrid decomposition heuristics for solving large-scale scheduling problems in semiconductor wafer fabrication (Q880579): Difference between revisions
From MaRDI portal
ReferenceBot (talk | contribs) Changed an Item |
Normalize DOI. |
||
Property / DOI | |||
Property / DOI: 10.1007/s10951-006-0325-5 / rank | |||
Property / DOI | |||
Property / DOI: 10.1007/S10951-006-0325-5 / rank | |||
Normal rank |
Latest revision as of 06:51, 10 December 2024
scientific article
Language | Label | Description | Also known as |
---|---|---|---|
English | Hybrid decomposition heuristics for solving large-scale scheduling problems in semiconductor wafer fabrication |
scientific article |
Statements
Hybrid decomposition heuristics for solving large-scale scheduling problems in semiconductor wafer fabrication (English)
0 references
15 May 2007
0 references
Job shop scheduling
0 references
Maximum lateness
0 references
Shifting bottleneck
0 references
Computational evaluation
0 references
0 references
0 references
0 references
0 references
0 references