Flow shop scheduling to minimize the total completion time with a permanently present operator: Models and ant colony optimization metaheuristic (Q709121): Difference between revisions
From MaRDI portal
ReferenceBot (talk | contribs) Changed an Item |
Normalize DOI. |
||
(2 intermediate revisions by one other user not shown) | |||
Property / DOI | |||
Property / DOI: 10.1016/j.cor.2010.04.009 / rank | |||
Property / DOI | |||
Property / DOI: 10.1016/J.COR.2010.04.009 / rank | |||
Normal rank |
Latest revision as of 01:29, 10 December 2024
scientific article
Language | Label | Description | Also known as |
---|---|---|---|
English | Flow shop scheduling to minimize the total completion time with a permanently present operator: Models and ant colony optimization metaheuristic |
scientific article |
Statements
Flow shop scheduling to minimize the total completion time with a permanently present operator: Models and ant colony optimization metaheuristic (English)
0 references
15 October 2010
0 references
scheduling
0 references
integer programming
0 references
ant colony optimization
0 references
metaheuristic
0 references
0 references