The integrated lot sizing and cutting stock problem with saw cycle constraints applied to furniture production (Q1652159): Difference between revisions

From MaRDI portal
ReferenceBot (talk | contribs)
Changed an Item
Import241208061232 (talk | contribs)
Normalize DOI.
 
Property / DOI
 
Property / DOI: 10.1016/j.cor.2016.10.015 / rank
Normal rank
 
Property / DOI
 
Property / DOI: 10.1016/J.COR.2016.10.015 / rank
 
Normal rank

Latest revision as of 01:02, 11 December 2024

scientific article
Language Label Description Also known as
English
The integrated lot sizing and cutting stock problem with saw cycle constraints applied to furniture production
scientific article

    Statements

    The integrated lot sizing and cutting stock problem with saw cycle constraints applied to furniture production (English)
    0 references
    0 references
    0 references
    0 references
    11 July 2018
    0 references
    two-dimensional cutting stock
    0 references
    lot sizing
    0 references
    integrated problems
    0 references
    saw cycles constraints
    0 references
    furniture factory
    0 references

    Identifiers

    0 references
    0 references
    0 references
    0 references
    0 references
    0 references
    0 references