Bi-Objective Flow Shop Scheduling with Equipotential Parallel Machines (Q6193885): Difference between revisions

From MaRDI portal
ReferenceBot (talk | contribs)
Changed an Item
Normalize DOI.
 
Property / DOI
 
Property / DOI: 10.47836/mjms.16.3.04 / rank
Normal rank
 
Property / DOI
 
Property / DOI: 10.47836/MJMS.16.3.04 / rank
 
Normal rank

Latest revision as of 19:20, 30 December 2024

scientific article; zbMATH DE number 7819999
Language Label Description Also known as
English
Bi-Objective Flow Shop Scheduling with Equipotential Parallel Machines
scientific article; zbMATH DE number 7819999

    Statements

    Bi-Objective Flow Shop Scheduling with Equipotential Parallel Machines (English)
    0 references
    19 March 2024
    0 references
    scheduling
    0 references
    parallel machines
    0 references
    fuzzy triangular number
    0 references
    branch-and-bound
    0 references
    make span
    0 references

    Identifiers