Bi-Objective Flow Shop Scheduling with Equipotential Parallel Machines (Q6193885): Difference between revisions
From MaRDI portal
ReferenceBot (talk | contribs) Changed an Item |
Normalize DOI. |
||
Property / DOI | |||
Property / DOI: 10.47836/mjms.16.3.04 / rank | |||
Property / DOI | |||
Property / DOI: 10.47836/MJMS.16.3.04 / rank | |||
Normal rank |
Latest revision as of 19:20, 30 December 2024
scientific article; zbMATH DE number 7819999
Language | Label | Description | Also known as |
---|---|---|---|
English | Bi-Objective Flow Shop Scheduling with Equipotential Parallel Machines |
scientific article; zbMATH DE number 7819999 |
Statements
Bi-Objective Flow Shop Scheduling with Equipotential Parallel Machines (English)
0 references
19 March 2024
0 references
scheduling
0 references
parallel machines
0 references
fuzzy triangular number
0 references
branch-and-bound
0 references
make span
0 references
0 references
0 references
0 references
0 references
0 references
0 references
0 references