Combined planning and scheduling in a divergent production system with co-production: a case study in the lumber industry (Q632662): Difference between revisions

From MaRDI portal
Normalize DOI.
Normalize DOI.
 
Property / DOI
 
Property / DOI: 10.1016/J.COR.2010.10.013 / rank
Normal rank
 
Property / DOI
 
Property / DOI: 10.1016/J.COR.2010.10.013 / rank
 
Normal rank

Latest revision as of 23:08, 9 December 2024

scientific article
Language Label Description Also known as
English
Combined planning and scheduling in a divergent production system with co-production: a case study in the lumber industry
scientific article

    Statements

    Combined planning and scheduling in a divergent production system with co-production: a case study in the lumber industry (English)
    0 references
    0 references
    0 references
    0 references
    0 references
    25 March 2011
    0 references
    integrated planning and scheduling
    0 references
    mathematical programming
    0 references
    constraint programming
    0 references
    wood drying and finishing
    0 references
    anytime algorithm
    0 references
    lumber industry
    0 references

    Identifiers