Rescheduling with new orders and general maximum allowable time disruptions (Q330107): Difference between revisions

From MaRDI portal
Importer (talk | contribs)
Created a new Item
 
ReferenceBot (talk | contribs)
Changed an Item
 
(6 intermediate revisions by 5 users not shown)
Property / author
 
Property / author: Qiu-Lan Zhao / rank
Normal rank
 
Property / author
 
Property / author: Ling-Fa Lu / rank
Normal rank
 
Property / author
 
Property / author: Qiu-Lan Zhao / rank
 
Normal rank
Property / author
 
Property / author: Ling-Fa Lu / rank
 
Normal rank
Property / Mathematics Subject Classification ID
 
Property / Mathematics Subject Classification ID: 90B35 / rank
 
Normal rank
Property / zbMATH DE Number
 
Property / zbMATH DE Number: 6642807 / rank
 
Normal rank
Property / zbMATH Keywords
 
rescheduling
Property / zbMATH Keywords: rescheduling / rank
 
Normal rank
Property / zbMATH Keywords
 
time disruption
Property / zbMATH Keywords: time disruption / rank
 
Normal rank
Property / zbMATH Keywords
 
maximum lateness
Property / zbMATH Keywords: maximum lateness / rank
 
Normal rank
Property / zbMATH Keywords
 
total completion time
Property / zbMATH Keywords: total completion time / rank
 
Normal rank
Property / MaRDI profile type
 
Property / MaRDI profile type: MaRDI publication profile / rank
 
Normal rank
Property / full work available at URL
 
Property / full work available at URL: https://doi.org/10.1007/s10288-016-0308-0 / rank
 
Normal rank
Property / OpenAlex ID
 
Property / OpenAlex ID: W2345658910 / rank
 
Normal rank
Property / cites work
 
Property / cites work: Improving schedule stability in single-machine rescheduling for new operation insertion / rank
 
Normal rank
Property / cites work
 
Property / cites work: Executing production schedules in the face of uncertainties: a review and some future directions / rank
 
Normal rank
Property / cites work
 
Property / cites work: Pareto minimizing total completion time and maximum cost with positional due indices / rank
 
Normal rank
Property / cites work
 
Property / cites work: Q4198056 / rank
 
Normal rank
Property / cites work
 
Property / cites work: Optimization and Approximation in Deterministic Sequencing and Scheduling: a Survey / rank
 
Normal rank
Property / cites work
 
Property / cites work: Rescheduling for New Orders / rank
 
Normal rank
Property / cites work
 
Property / cites work: Rescheduling for Multiple New Orders / rank
 
Normal rank
Property / cites work
 
Property / cites work: Rescheduling for new orders on a single machine with setup times / rank
 
Normal rank
Property / cites work
 
Property / cites work: Production scheduling/rescheduling in flexible manufacturing / rank
 
Normal rank
Property / cites work
 
Property / cites work: Single machine scheduling with release times, deadlines and tardiness objectives / rank
 
Normal rank
Property / cites work
 
Property / cites work: The complexity of machine scheduling for stability with a single disrupted job / rank
 
Normal rank
Property / cites work
 
Property / cites work: Single-machine rescheduling with deterioration and learning effects against the maximum sequence disruption / rank
 
Normal rank
Property / cites work
 
Property / cites work: Q3020741 / rank
 
Normal rank
Property / cites work
 
Property / cites work: A bi‐objective approach to reschedule new jobs in a one machine model / rank
 
Normal rank
Property / cites work
 
Property / cites work: Rescheduling on a single machine with part-type dependent setup times and deadlines / rank
 
Normal rank
Property / cites work
 
Property / cites work: Rescheduling manufacturing systems: A framework of strategies, policies, and methods / rank
 
Normal rank
Property / cites work
 
Property / cites work: Rescheduling with release dates to minimize makespan under a limit on the maximum sequence disruption / rank
 
Normal rank
Property / cites work
 
Property / cites work: RESCHEDULING WITH RELEASE DATES TO MINIMIZE TOTAL SEQUENCE DISRUPTION UNDER A LIMIT ON THE MAKESPAN / rank
 
Normal rank
Property / cites work
 
Property / cites work: Rescheduling problems with deteriorating jobs under disruptions / rank
 
Normal rank
Property / cites work
 
Property / cites work: Pareto optimization of rescheduling with release dates to minimize makespan and total sequence disruption / rank
 
Normal rank
links / mardi / namelinks / mardi / name
 

Latest revision as of 18:48, 12 July 2024

scientific article
Language Label Description Also known as
English
Rescheduling with new orders and general maximum allowable time disruptions
scientific article

    Statements

    Rescheduling with new orders and general maximum allowable time disruptions (English)
    0 references
    0 references
    0 references
    0 references
    0 references
    24 October 2016
    0 references
    rescheduling
    0 references
    time disruption
    0 references
    maximum lateness
    0 references
    total completion time
    0 references
    0 references
    0 references

    Identifiers