A heuristic for the quay crane scheduling problem based on contiguous bay crane operations (Q339620): Difference between revisions

From MaRDI portal
Importer (talk | contribs)
Created a new Item
 
ReferenceBot (talk | contribs)
Changed an Item
 
(6 intermediate revisions by 5 users not shown)
Property / author
 
Property / author: Zhi-Qiang Lu / rank
Normal rank
 
Property / author
 
Property / author: Xiao-Le Han / rank
Normal rank
 
Property / author
 
Property / author: Li-Feng Xi / rank
Normal rank
 
Property / author
 
Property / author: Li-Feng Xi / rank
 
Normal rank
Property / author
 
Property / author: Zhi-Qiang Lu / rank
 
Normal rank
Property / author
 
Property / author: Xiao-Le Han / rank
 
Normal rank
Property / Mathematics Subject Classification ID
 
Property / Mathematics Subject Classification ID: 90B35 / rank
 
Normal rank
Property / Mathematics Subject Classification ID
 
Property / Mathematics Subject Classification ID: 90C59 / rank
 
Normal rank
Property / zbMATH DE Number
 
Property / zbMATH DE Number: 6651757 / rank
 
Normal rank
Property / zbMATH Keywords
 
container terminal operation
Property / zbMATH Keywords: container terminal operation / rank
 
Normal rank
Property / zbMATH Keywords
 
quay crane scheduling
Property / zbMATH Keywords: quay crane scheduling / rank
 
Normal rank
Property / MaRDI profile type
 
Property / MaRDI profile type: MaRDI publication profile / rank
 
Normal rank
Property / full work available at URL
 
Property / full work available at URL: https://doi.org/10.1016/j.cor.2012.02.013 / rank
 
Normal rank
Property / OpenAlex ID
 
Property / OpenAlex ID: W1966870289 / rank
 
Normal rank
Property / cites work
 
Property / cites work: Operations research at container terminals: a literature update / rank
 
Normal rank
Property / cites work
 
Property / cites work: Transshipment of containers at a container terminal: An overview / rank
 
Normal rank
Property / cites work
 
Property / cites work: A survey of berth allocation and quay crane scheduling problems in container terminals / rank
 
Normal rank
Property / cites work
 
Property / cites work: Container terminal operation and operations research -- a classification and literature review / rank
 
Normal rank
Property / cites work
 
Property / cites work: Crane scheduling with spatial constraints / rank
 
Normal rank
Property / cites work
 
Property / cites work: A <i>m</i>‐parallel crane scheduling problem with a non‐crossing constraint / rank
 
Normal rank
Property / cites work
 
Property / cites work: Quay crane scheduling at container terminals to minimize the maximum relative tardiness of vessel departures / rank
 
Normal rank
Property / cites work
 
Property / cites work: A fast heuristic for quay crane scheduling with interference constraints / rank
 
Normal rank
Property / cites work
 
Property / cites work: A crane scheduling method for port container terminals / rank
 
Normal rank
Property / cites work
 
Property / cites work: A branch-and-cut algorithm for the quay crane scheduling problem in a container terminal / rank
 
Normal rank
Property / cites work
 
Property / cites work: A tabu search heuristic for the quay crane scheduling problem / rank
 
Normal rank
Property / cites work
 
Property / cites work: Container sequencing for quay cranes with internal reshuffles / rank
 
Normal rank
links / mardi / namelinks / mardi / name
 

Latest revision as of 22:05, 12 July 2024

scientific article
Language Label Description Also known as
English
A heuristic for the quay crane scheduling problem based on contiguous bay crane operations
scientific article

    Statements

    A heuristic for the quay crane scheduling problem based on contiguous bay crane operations (English)
    0 references
    0 references
    0 references
    0 references
    0 references
    11 November 2016
    0 references
    container terminal operation
    0 references
    quay crane scheduling
    0 references

    Identifiers