Solving the vendor-buyer integrated inventory system with arithmetic-geometric inequality (Q552115): Difference between revisions

From MaRDI portal
Importer (talk | contribs)
Created a new Item
 
ReferenceBot (talk | contribs)
Changed an Item
 
(5 intermediate revisions by 5 users not shown)
Property / Mathematics Subject Classification ID
 
Property / Mathematics Subject Classification ID: 90B05 / rank
 
Normal rank
Property / Mathematics Subject Classification ID
 
Property / Mathematics Subject Classification ID: 26D15 / rank
 
Normal rank
Property / zbMATH DE Number
 
Property / zbMATH DE Number: 5929943 / rank
 
Normal rank
Property / zbMATH Keywords
 
integrated production inventory model
Property / zbMATH Keywords: integrated production inventory model / rank
 
Normal rank
Property / zbMATH Keywords
 
two-stage supply chain
Property / zbMATH Keywords: two-stage supply chain / rank
 
Normal rank
Property / zbMATH Keywords
 
economic lot size
Property / zbMATH Keywords: economic lot size / rank
 
Normal rank
Property / zbMATH Keywords
 
algebraic optimization
Property / zbMATH Keywords: algebraic optimization / rank
 
Normal rank
Property / zbMATH Keywords
 
arithmetic-geometric inequality
Property / zbMATH Keywords: arithmetic-geometric inequality / rank
 
Normal rank
Property / MaRDI profile type
 
Property / MaRDI profile type: MaRDI publication profile / rank
 
Normal rank
Property / full work available at URL
 
Property / full work available at URL: https://doi.org/10.1016/j.mcm.2010.11.056 / rank
 
Normal rank
Property / OpenAlex ID
 
Property / OpenAlex ID: W2044560731 / rank
 
Normal rank
Property / cites work
 
Property / cites work: Global optimal policy for vendor-buyer integrated inventory system within just in time environment / rank
 
Normal rank
Property / cites work
 
Property / cites work: Optimizing the economic lot size of a three-stage supply chain with backordering derived without derivatives / rank
 
Normal rank
Property / cites work
 
Property / cites work: A note on the economic lot size of the integrated vendor-buyer inventory system derived without derivatives / rank
 
Normal rank
Property / cites work
 
Property / cites work: The economic lot size of the integrated vendor‐buyer inventory system derived without derivatives / rank
 
Normal rank
Property / cites work
 
Property / cites work: An easy method to derive EOQ and EPQ inventory models with backorders / rank
 
Normal rank
Property / cites work
 
Property / cites work: Q3447241 / rank
 
Normal rank
Property / cites work
 
Property / cites work: A simple method to compute economic order quantities / rank
 
Normal rank
Property / cites work
 
Property / cites work: A comprehensive note on: an inventory model under two levels of trade credit and limited storage space derived without derivatives / rank
 
Normal rank
Property / cites work
 
Property / cites work: A modified method to compute economic order quantities without derivatives by cost-difference comparisons / rank
 
Normal rank
Property / cites work
 
Property / cites work: The derivation of EOQ/EPQ inventory models with two backorders costs using analytic geometry and algebra / rank
 
Normal rank
Property / cites work
 
Property / cites work: A simple method to compute economic order quantities: some observations / rank
 
Normal rank
Property / cites work
 
Property / cites work: The integrality of the lot size in the basic EOQ and EPQ models: applications to other production-inventory models / rank
 
Normal rank
Property / cites work
 
Property / cites work: Using the EPQ for coordinated planning of a product with partial backordering and its components / rank
 
Normal rank
links / mardi / namelinks / mardi / name
 

Latest revision as of 07:12, 4 July 2024

scientific article
Language Label Description Also known as
English
Solving the vendor-buyer integrated inventory system with arithmetic-geometric inequality
scientific article

    Statements

    Solving the vendor-buyer integrated inventory system with arithmetic-geometric inequality (English)
    0 references
    21 July 2011
    0 references
    integrated production inventory model
    0 references
    two-stage supply chain
    0 references
    economic lot size
    0 references
    algebraic optimization
    0 references
    arithmetic-geometric inequality
    0 references

    Identifiers