The Shifting Bottleneck Procedure for Job Shop Scheduling (Q3778528): Difference between revisions
From MaRDI portal
Created a new Item |
Normalize DOI. |
||
(3 intermediate revisions by 3 users not shown) | |||
Property / DOI | |||
Property / DOI: 10.1287/mnsc.34.3.391 / rank | |||
Property / MaRDI profile type | |||
Property / MaRDI profile type: MaRDI publication profile / rank | |||
Normal rank | |||
Property / full work available at URL | |||
Property / full work available at URL: https://doi.org/10.1287/mnsc.34.3.391 / rank | |||
Normal rank | |||
Property / OpenAlex ID | |||
Property / OpenAlex ID: W2088304441 / rank | |||
Normal rank | |||
Property / DOI | |||
Property / DOI: 10.1287/MNSC.34.3.391 / rank | |||
Normal rank | |||
links / mardi / name | links / mardi / name | ||
Latest revision as of 18:24, 21 December 2024
scientific article
Language | Label | Description | Also known as |
---|---|---|---|
English | The Shifting Bottleneck Procedure for Job Shop Scheduling |
scientific article |
Statements
The Shifting Bottleneck Procedure for Job Shop Scheduling (English)
0 references
1988
0 references
approximation method
0 references
minimum makespan
0 references
job shop scheduling
0 references
bottleneck
0 references