Hybrid flowshop scheduling with machine and resource-dependent processing times (Q534872): Difference between revisions

From MaRDI portal
Importer (talk | contribs)
Changed an Item
Normalize DOI.
 
(8 intermediate revisions by 7 users not shown)
Property / DOI
 
Property / DOI: 10.1016/j.apm.2010.07.057 / rank
Normal rank
 
Property / author
 
Property / author: Seyyed Mohammad Taghi Fatemi Ghomi / rank
Normal rank
 
Property / author
 
Property / author: Seyyed Mohammad Taghi Fatemi Ghomi / rank
 
Normal rank
Property / describes a project that uses
 
Property / describes a project that uses: Genocop / rank
 
Normal rank
Property / MaRDI profile type
 
Property / MaRDI profile type: MaRDI publication profile / rank
 
Normal rank
Property / full work available at URL
 
Property / full work available at URL: https://doi.org/10.1016/j.apm.2010.07.057 / rank
 
Normal rank
Property / OpenAlex ID
 
Property / OpenAlex ID: W2016921772 / rank
 
Normal rank
Property / cites work
 
Property / cites work: A two-stage hybrid flowshop scheduling problem with a function constraint and unrelated alternative machines / rank
 
Normal rank
Property / cites work
 
Property / cites work: A hybrid multi-objective immune algorithm for a flow shop scheduling problem with bi-objectives: weighted mean completion time and weighted mean tardiness / rank
 
Normal rank
Property / cites work
 
Property / cites work: Q5187227 / rank
 
Normal rank
Property / cites work
 
Property / cites work: Multiple objective decision making - methods and applications. A state- of-the-art survey. In collaboration with Sudhakar R. Paidy and Kwangsun Yoon / rank
 
Normal rank
Property / cites work
 
Property / cites work: A comparison of scheduling algorithms for flexible flow shop problems with unrelated parallel machines, setup times, and dual criteria / rank
 
Normal rank
Property / cites work
 
Property / cites work: On min-norm and min-max methods of multi-objective optimization / rank
 
Normal rank
Property / cites work
 
Property / cites work: Q3832072 / rank
 
Normal rank
Property / cites work
 
Property / cites work: Q4817401 / rank
 
Normal rank
Property / cites work
 
Property / cites work: Q4422139 / rank
 
Normal rank
Property / cites work
 
Property / cites work: A multi-population genetic algorithm to solve multi-objective scheduling problems for parallel machines. / rank
 
Normal rank
Property / cites work
 
Property / cites work: Computational experience with a branch-and-cut algorithm for flowshop scheduling with setups. / rank
 
Normal rank
Property / cites work
 
Property / cites work: A flexible flowshop problem with total flow time minimization / rank
 
Normal rank
Property / cites work
 
Property / cites work: Heuristics for hybrid flow shops with controllable processing times and assignable due dates / rank
 
Normal rank
Property / cites work
 
Property / cites work: A tabu search algorithm for the multi-stage parallel machine problem with limited buffer capacities. / rank
 
Normal rank
Property / cites work
 
Property / cites work: Group technology in a hybrid flowshop environment: a case study / rank
 
Normal rank
Property / cites work
 
Property / cites work: A new Lagrangian relaxation algorithm for hybrid flowshop scheduling to minimize total weighted completion time / rank
 
Normal rank
Property / cites work
 
Property / cites work: An immune algorithm approach to hybrid flow shops scheduling with sequence-dependent setup times / rank
 
Normal rank
Property / cites work
 
Property / cites work: Optimization by Simulated Annealing: An Experimental Evaluation; Part I, Graph Partitioning / rank
 
Normal rank
Property / cites work
 
Property / cites work: Minimizing maximum completion time in a proportionate flow shop with one machine of different speed / rank
 
Normal rank
Property / cites work
 
Property / cites work: An iterated greedy heuristic for multistage hybrid flowshop scheduling problems with multiprocessor tasks / rank
 
Normal rank
Property / cites work
 
Property / cites work: Heuristics for a two-stage hybrid flowshop scheduling problem with ready times and a product-mix ratio constraint / rank
 
Normal rank
Property / cites work
 
Property / cites work: A tabu search heuristic for the hybrid flowshop scheduling with finite intermediate buffers / rank
 
Normal rank
Property / cites work
 
Property / cites work: Heuristic for a new multiobjective scheduling problem / rank
 
Normal rank
Property / cites work
 
Property / cites work: Nonlinear multiobjective optimization / rank
 
Normal rank
Property / cites work
 
Property / cites work: Q3815146 / rank
 
Normal rank
Property / cites work
 
Property / cites work: Q4079017 / rank
 
Normal rank
Property / cites work
 
Property / cites work: Metaheuristics for scheduling a non-permutation flowline manufacturing cell with sequence dependent family setup times / rank
 
Normal rank
Property / cites work
 
Property / cites work: Q4873721 / rank
 
Normal rank
Property / cites work
 
Property / cites work: Solving parallel machines scheduling problems with sequence-dependent setup times using variable neighbourhood search / rank
 
Normal rank
Property / DOI
 
Property / DOI: 10.1016/J.APM.2010.07.057 / rank
 
Normal rank
links / mardi / namelinks / mardi / name
 

Latest revision as of 20:44, 9 December 2024

scientific article
Language Label Description Also known as
English
Hybrid flowshop scheduling with machine and resource-dependent processing times
scientific article

    Statements

    Hybrid flowshop scheduling with machine and resource-dependent processing times (English)
    0 references
    10 May 2011
    0 references
    hybrid flowshop scheduling
    0 references
    hybrid metaheuristic
    0 references
    multi-objective optimization
    0 references
    resource allocation
    0 references
    machines with different speeds
    0 references
    sequence-dependent setup times
    0 references
    0 references
    0 references
    0 references
    0 references
    0 references
    0 references
    0 references

    Identifiers