Scheduling three-operation jobs in a two-machine flow shop to minimize makespan (Q596459): Difference between revisions
From MaRDI portal
Created a new Item |
Normalize DOI. |
||
(6 intermediate revisions by 5 users not shown) | |||
Property / DOI | |||
Property / DOI: 10.1023/B:ANOR.0000030687.72169.c7 / rank | |||
Property / author | |||
Property / author: Kyparisis, George J. / rank | |||
Property / author | |||
Property / author: Vitaly A. Strusevich / rank | |||
Property / author | |||
Property / author: Kyparisis, George J. / rank | |||
Normal rank | |||
Property / author | |||
Property / author: Vitaly A. Strusevich / rank | |||
Normal rank | |||
Property / MaRDI profile type | |||
Property / MaRDI profile type: Publication / rank | |||
Normal rank | |||
Property / full work available at URL | |||
Property / full work available at URL: https://doi.org/10.1023/b:anor.0000030687.72169.c7 / rank | |||
Normal rank | |||
Property / OpenAlex ID | |||
Property / OpenAlex ID: W2008645045 / rank | |||
Normal rank | |||
Property / DOI | |||
Property / DOI: 10.1023/B:ANOR.0000030687.72169.C7 / rank | |||
Normal rank | |||
links / mardi / name | links / mardi / name | ||
Latest revision as of 21:49, 9 December 2024
scientific article
Language | Label | Description | Also known as |
---|---|---|---|
English | Scheduling three-operation jobs in a two-machine flow shop to minimize makespan |
scientific article |
Statements
Scheduling three-operation jobs in a two-machine flow shop to minimize makespan (English)
0 references
10 August 2004
0 references
scheduling
0 references
flow shop
0 references
makespan
0 references
approximation algorithm
0 references
polynomial time approximation scheme
0 references