Two-machine flowshop scheduling with intermediate transportation under job physical space consideration (Q632667): Difference between revisions

From MaRDI portal
Importer (talk | contribs)
Created a new Item
 
Import241208061232 (talk | contribs)
Normalize DOI.
 
(6 intermediate revisions by 6 users not shown)
Property / DOI
 
Property / DOI: 10.1016/j.cor.2010.10.018 / rank
Normal rank
 
Property / MaRDI profile type
 
Property / MaRDI profile type: Publication / rank
 
Normal rank
Property / full work available at URL
 
Property / full work available at URL: https://doi.org/10.1016/j.cor.2010.10.018 / rank
 
Normal rank
Property / OpenAlex ID
 
Property / OpenAlex ID: W2018085196 / rank
 
Normal rank
Property / cites work
 
Property / cites work: Q3525910 / rank
 
Normal rank
Property / cites work
 
Property / cites work: Machine scheduling with transportation considerations / rank
 
Normal rank
Property / cites work
 
Property / cites work: Machine scheduling with job delivery coordination / rank
 
Normal rank
Property / cites work
 
Property / cites work: Improved algorithms for two single machine scheduling problems / rank
 
Normal rank
Property / cites work
 
Property / cites work: On the machine scheduling problem with job delivery coordination / rank
 
Normal rank
Property / cites work
 
Property / cites work: Optimal two- and three-stage production schedules with setup times included / rank
 
Normal rank
Property / cites work
 
Property / cites work: Q4198056 / rank
 
Normal rank
Property / cites work
 
Property / cites work: Q4290987 / rank
 
Normal rank
Property / cites work
 
Property / cites work: Q3145801 / rank
 
Normal rank
Property / DOI
 
Property / DOI: 10.1016/J.COR.2010.10.018 / rank
 
Normal rank
links / mardi / namelinks / mardi / name
 

Latest revision as of 00:08, 10 December 2024

scientific article
Language Label Description Also known as
English
Two-machine flowshop scheduling with intermediate transportation under job physical space consideration
scientific article

    Statements

    Two-machine flowshop scheduling with intermediate transportation under job physical space consideration (English)
    0 references
    0 references
    0 references
    25 March 2011
    0 references
    coordinated scheduling
    0 references
    logistics
    0 references
    flowshop
    0 references
    worst-case analysis
    0 references

    Identifiers