Inspection resource assignment in a multistage manufacturing system with an inspection error model (Q4656114): Difference between revisions

From MaRDI portal
Importer (talk | contribs)
Created a new Item
 
ReferenceBot (talk | contribs)
Changed an Item
 
(3 intermediate revisions by 3 users not shown)
Property / MaRDI profile type
 
Property / MaRDI profile type: MaRDI publication profile / rank
 
Normal rank
Property / full work available at URL
 
Property / full work available at URL: https://doi.org/10.1080/00207540110119982 / rank
 
Normal rank
Property / OpenAlex ID
 
Property / OpenAlex ID: W1990313818 / rank
 
Normal rank
Property / cites work
 
Property / cites work: Inspection for Circuit Board Assembly / rank
 
Normal rank
Property / cites work
 
Property / cites work: Planning quality inspection operations in multistage manufacturing systems with inspection errors / rank
 
Normal rank
Property / cites work
 
Property / cites work: Optimal inspection policies in a serial production system including scrap rework and repair: An MILP approach / rank
 
Normal rank
links / mardi / namelinks / mardi / name
 

Latest revision as of 18:44, 7 June 2024

scientific article; zbMATH DE number 2142872
Language Label Description Also known as
English
Inspection resource assignment in a multistage manufacturing system with an inspection error model
scientific article; zbMATH DE number 2142872

    Statements

    Identifiers