Flow shop scheduling to minimize the total completion time with a permanently present operator: Models and ant colony optimization metaheuristic (Q709121): Difference between revisions

From MaRDI portal
Added link to MaRDI item.
RedirectionBot (talk | contribs)
Removed claims
Property / author
 
Property / author: Q322483 / rank
Normal rank
 
Property / author
 
Property / author: Yash P. Aneja / rank
Normal rank
 

Revision as of 01:41, 20 February 2024

scientific article
Language Label Description Also known as
English
Flow shop scheduling to minimize the total completion time with a permanently present operator: Models and ant colony optimization metaheuristic
scientific article

    Statements

    Flow shop scheduling to minimize the total completion time with a permanently present operator: Models and ant colony optimization metaheuristic (English)
    0 references
    0 references
    15 October 2010
    0 references
    scheduling
    0 references
    integer programming
    0 references
    ant colony optimization
    0 references
    metaheuristic
    0 references

    Identifiers