Scheduling a two-stage hybrid flow shop with parallel machines at the first stage (Q1357780): Difference between revisions
From MaRDI portal
Added link to MaRDI item. |
Removed claims |
||
Property / author | |||
Property / author: Jatinder N. D. Gupta / rank | |||
Property / author | |||
Property / author: Chris N. Potts / rank | |||
Revision as of 07:39, 10 February 2024
scientific article
Language | Label | Description | Also known as |
---|---|---|---|
English | Scheduling a two-stage hybrid flow shop with parallel machines at the first stage |
scientific article |
Statements
Scheduling a two-stage hybrid flow shop with parallel machines at the first stage (English)
0 references
16 June 1997
0 references
identical parallel machines
0 references
non-preemptive two-stage hybrid flow shop
0 references
maximum completion time
0 references
makespan
0 references
lower bounds
0 references
branch and bound
0 references
heuristics
0 references