Scheduling a two-stage hybrid flow shop with parallel machines at the first stage (Q1357780): Difference between revisions

From MaRDI portal
Added link to MaRDI item.
RedirectionBot (talk | contribs)
Removed claims
Property / author
 
Property / author: Jatinder N. D. Gupta / rank
Normal rank
 
Property / author
 
Property / author: Chris N. Potts / rank
Normal rank
 

Revision as of 07:39, 10 February 2024

scientific article
Language Label Description Also known as
English
Scheduling a two-stage hybrid flow shop with parallel machines at the first stage
scientific article

    Statements

    Scheduling a two-stage hybrid flow shop with parallel machines at the first stage (English)
    0 references
    0 references
    16 June 1997
    0 references
    identical parallel machines
    0 references
    non-preemptive two-stage hybrid flow shop
    0 references
    maximum completion time
    0 references
    makespan
    0 references
    lower bounds
    0 references
    branch and bound
    0 references
    heuristics
    0 references

    Identifiers