Pareto-scheduling with family jobs or ND-agent on a parallel-batch machine to minimize the makespan and maximum cost (Q2144217): Difference between revisions

From MaRDI portal
Added link to MaRDI item.
Import240304020342 (talk | contribs)
Set profile property.
Property / MaRDI profile type
 
Property / MaRDI profile type: MaRDI publication profile / rank
 
Normal rank

Revision as of 06:01, 5 March 2024

scientific article
Language Label Description Also known as
English
Pareto-scheduling with family jobs or ND-agent on a parallel-batch machine to minimize the makespan and maximum cost
scientific article

    Statements

    Pareto-scheduling with family jobs or ND-agent on a parallel-batch machine to minimize the makespan and maximum cost (English)
    0 references
    0 references
    0 references
    1 June 2022
    0 references
    Pareto-scheduling
    0 references
    parallel-batch machine
    0 references
    family jobs
    0 references
    ND agents
    0 references
    polynomial time
    0 references

    Identifiers