Mixed binary integer programming formulations for the flow shop scheduling problems. A case study: ISD projects scheduling (Q870153): Difference between revisions

From MaRDI portal
RedirectionBot (talk | contribs)
Changed an Item
Import240304020342 (talk | contribs)
Set profile property.
Property / MaRDI profile type
 
Property / MaRDI profile type: MaRDI publication profile / rank
 
Normal rank

Revision as of 02:27, 5 March 2024

scientific article
Language Label Description Also known as
English
Mixed binary integer programming formulations for the flow shop scheduling problems. A case study: ISD projects scheduling
scientific article

    Statements

    Mixed binary integer programming formulations for the flow shop scheduling problems. A case study: ISD projects scheduling (English)
    0 references
    0 references
    0 references
    12 March 2007
    0 references
    0 references
    scheduling
    0 references
    flow shop scheduling problem
    0 references
    mixed binary integer programming
    0 references
    projects scheduling
    0 references