The largest-Z-ratio-first algorithm is 0.8531-approximate for scheduling unreliable jobs on \(m\) parallel machines (Q2661490): Difference between revisions

From MaRDI portal
RedirectionBot (talk | contribs)
Removed claim: author (P16): Item:Q1622952
RedirectionBot (talk | contribs)
Changed an Item
Property / author
 
Property / author: Thomas F. Lidbetter / rank
 
Normal rank

Revision as of 02:40, 29 February 2024

scientific article
Language Label Description Also known as
English
The largest-Z-ratio-first algorithm is 0.8531-approximate for scheduling unreliable jobs on \(m\) parallel machines
scientific article

    Statements

    The largest-Z-ratio-first algorithm is 0.8531-approximate for scheduling unreliable jobs on \(m\) parallel machines (English)
    0 references
    0 references
    0 references
    7 April 2021
    0 references
    unreliable jobs
    0 references
    largest-ratio-first
    0 references
    approximation ratio
    0 references

    Identifiers