Twin-crane scheduling during seaside workload peaks with a dedicated handshake area (Q2124909): Difference between revisions
From MaRDI portal
Created a new Item |
Added link to MaRDI item. |
||
links / mardi / name | links / mardi / name | ||
Revision as of 22:38, 1 February 2024
scientific article
Language | Label | Description | Also known as |
---|---|---|---|
English | Twin-crane scheduling during seaside workload peaks with a dedicated handshake area |
scientific article |
Statements
Twin-crane scheduling during seaside workload peaks with a dedicated handshake area (English)
0 references
11 April 2022
0 references
port operations
0 references
container logistics
0 references
twin cranes
0 references
crane scheduling
0 references