Two-stage heuristic algorithms for part input sequencing in flexible manufacturing systems (Q5943940): Difference between revisions

From MaRDI portal
Import240304020342 (talk | contribs)
Set profile property.
ReferenceBot (talk | contribs)
Changed an Item
Property / cites work
 
Property / cites work: Due-date based loading and scheduling methods for a flexible manufacturing system with an automatic tool transporter / rank
 
Normal rank
Property / cites work
 
Property / cites work: Sequencing in an Assembly Line with Blocking to Minimize Cycle Time / rank
 
Normal rank
Property / cites work
 
Property / cites work: Level Schedules for Mixed-Model Assembly Lines in Just-In-Time Production Systems / rank
 
Normal rank
Property / cites work
 
Property / cites work: On the robustness of using balanced part mix ratios to determine cyclic part input sequences into flexible flow systems / rank
 
Normal rank

Revision as of 20:01, 3 June 2024

scientific article; zbMATH DE number 1648766
Language Label Description Also known as
English
Two-stage heuristic algorithms for part input sequencing in flexible manufacturing systems
scientific article; zbMATH DE number 1648766

    Statements

    Two-stage heuristic algorithms for part input sequencing in flexible manufacturing systems (English)
    0 references
    0 references
    0 references
    0 references
    21 January 2003
    0 references
    part input sequencing
    0 references
    flexible manufacturing systems
    0 references
    two-stage heuristic algorithms
    0 references

    Identifiers