Parallel-batch scheduling of deteriorating jobs with release dates to minimize the makespan (Q541691): Difference between revisions
From MaRDI portal
Set profile property. |
Set OpenAlex properties. |
||
Property / full work available at URL | |||
Property / full work available at URL: https://doi.org/10.1016/j.ejor.2010.11.021 / rank | |||
Normal rank | |||
Property / OpenAlex ID | |||
Property / OpenAlex ID: W2003007295 / rank | |||
Normal rank |
Revision as of 20:26, 19 March 2024
scientific article
Language | Label | Description | Also known as |
---|---|---|---|
English | Parallel-batch scheduling of deteriorating jobs with release dates to minimize the makespan |
scientific article |
Statements
Parallel-batch scheduling of deteriorating jobs with release dates to minimize the makespan (English)
0 references
7 June 2011
0 references
scheduling
0 references
batching
0 references
deterioration
0 references
release dates
0 references
dynamic programming
0 references