Parallel-batch scheduling of deteriorating jobs with release dates to minimize the makespan (Q541691): Difference between revisions

From MaRDI portal
Import240304020342 (talk | contribs)
Set profile property.
Set OpenAlex properties.
Property / full work available at URL
 
Property / full work available at URL: https://doi.org/10.1016/j.ejor.2010.11.021 / rank
 
Normal rank
Property / OpenAlex ID
 
Property / OpenAlex ID: W2003007295 / rank
 
Normal rank

Revision as of 20:26, 19 March 2024

scientific article
Language Label Description Also known as
English
Parallel-batch scheduling of deteriorating jobs with release dates to minimize the makespan
scientific article

    Statements

    Parallel-batch scheduling of deteriorating jobs with release dates to minimize the makespan (English)
    0 references
    0 references
    0 references
    7 June 2011
    0 references
    scheduling
    0 references
    batching
    0 references
    deterioration
    0 references
    release dates
    0 references
    dynamic programming
    0 references

    Identifiers