An evolutionary algorithm for the resource-constrained project scheduling problem with minimum and maximum time lags (Q657259): Difference between revisions

From MaRDI portal
Import240304020342 (talk | contribs)
Set profile property.
Set OpenAlex properties.
Property / full work available at URL
 
Property / full work available at URL: https://doi.org/10.1007/s10951-009-0125-9 / rank
 
Normal rank
Property / OpenAlex ID
 
Property / OpenAlex ID: W2083823805 / rank
 
Normal rank

Revision as of 23:24, 19 March 2024

scientific article
Language Label Description Also known as
English
An evolutionary algorithm for the resource-constrained project scheduling problem with minimum and maximum time lags
scientific article

    Statements

    An evolutionary algorithm for the resource-constrained project scheduling problem with minimum and maximum time lags (English)
    0 references
    0 references
    0 references
    0 references
    16 January 2012
    0 references
    resource-constrained project scheduling
    0 references
    maximum time lags
    0 references
    meta-heuristic algorithms
    0 references

    Identifiers