Multi-level production scheduling for a class of flexible machining and assembly systems (Q918393): Difference between revisions

From MaRDI portal
Import240304020342 (talk | contribs)
Set profile property.
ReferenceBot (talk | contribs)
Changed an Item
Property / cites work
 
Property / cites work: Computationally Efficient Optimal Solutions to the Lot-Sizing Problem in Multistage Assembly Systems / rank
 
Normal rank
Property / cites work
 
Property / cites work: Mathematical Programming Approaches to Capacity-Constrained MRP Systems: Review, Formulation and Problem Reduction / rank
 
Normal rank
Property / cites work
 
Property / cites work: Approximation Methods for the Uncapacitated Dynamic Lot Size Problem / rank
 
Normal rank
Property / cites work
 
Property / cites work: Improved Heuristics for Multi-Stage Requirements Planning Systems / rank
 
Normal rank
Property / cites work
 
Property / cites work: Hierarchical Production Planning: A Two-Stage System / rank
 
Normal rank
Property / cites work
 
Property / cites work: Q4131987 / rank
 
Normal rank
Property / cites work
 
Property / cites work: Q3938812 / rank
 
Normal rank
Property / cites work
 
Property / cites work: The Lagrangian Relaxation Method for Solving Integer Programming Problems / rank
 
Normal rank
Property / cites work
 
Property / cites work: On Flow Shop Scheduling with Release and Due Dates to Minimize Maximum Lateness / rank
 
Normal rank
Property / cites work
 
Property / cites work: Multi-Stage Production Planning / rank
 
Normal rank
Property / cites work
 
Property / cites work: A Review of Production Scheduling / rank
 
Normal rank
Property / cites work
 
Property / cites work: Q4178782 / rank
 
Normal rank
Property / cites work
 
Property / cites work: Solution of fixed cost trans-shipment problems by a branch and bound method / rank
 
Normal rank
Property / cites work
 
Property / cites work: Q3911628 / rank
 
Normal rank
Property / cites work
 
Property / cites work: The Cutting-Plane Method for Solving Convex Programs / rank
 
Normal rank
Property / cites work
 
Property / cites work: Establishing Consistent and Realistic Reorder Intervals in Production-Distribution Systems / rank
 
Normal rank
Property / cites work
 
Property / cites work: Tables of Waiting Times for M/M/n, M/D/n and D/M/n and Their Use to Give Approximate Waiting Times in More General Queues / rank
 
Normal rank
Property / cites work
 
Property / cites work: Q5668575 / rank
 
Normal rank
Property / cites work
 
Property / cites work: Q3968756 / rank
 
Normal rank
Property / cites work
 
Property / cites work: Q5187067 / rank
 
Normal rank
Property / cites work
 
Property / cites work: Q3775316 / rank
 
Normal rank
Property / cites work
 
Property / cites work: Aggregation of Resource Constraints for Groups of Similar Components in Manufacturing Systems / rank
 
Normal rank
Property / cites work
 
Property / cites work: A Backlogging Model and a Multi-Echelon Model of a Dynamic Economic Lot Size Production System—A Network Approach / rank
 
Normal rank

Revision as of 10:14, 21 June 2024

scientific article
Language Label Description Also known as
English
Multi-level production scheduling for a class of flexible machining and assembly systems
scientific article

    Statements

    Multi-level production scheduling for a class of flexible machining and assembly systems (English)
    0 references
    0 references
    1989
    0 references
    0 references
    machining
    0 references
    assembly systems
    0 references
    fast material flow
    0 references
    hierarchical production scheduling
    0 references
    0 references
    0 references
    0 references
    0 references
    0 references
    0 references
    0 references
    0 references
    0 references
    0 references
    0 references