Minimizing makespan in two-stage hybrid cross docking scheduling problem (Q1001000): Difference between revisions

From MaRDI portal
Import240304020342 (talk | contribs)
Set profile property.
Set OpenAlex properties.
Property / full work available at URL
 
Property / full work available at URL: https://doi.org/10.1016/j.cor.2008.07.003 / rank
 
Normal rank
Property / OpenAlex ID
 
Property / OpenAlex ID: W2088252115 / rank
 
Normal rank

Revision as of 22:37, 19 March 2024

scientific article
Language Label Description Also known as
English
Minimizing makespan in two-stage hybrid cross docking scheduling problem
scientific article

    Statements

    Minimizing makespan in two-stage hybrid cross docking scheduling problem (English)
    0 references
    0 references
    0 references
    12 February 2009
    0 references
    0 references
    machine scheduling
    0 references
    logistics
    0 references
    cross docking
    0 references
    0 references